https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING 420 (EMPAT RATUS DUA PULUH) TAHUN DI TAHUN 2024 MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
15 Oktober 2444 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
October 15th, 2444 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIA. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI DAN IUPK TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL LOGAM
IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE
Matrik 22. Rencana dan Realisasi Biaya Pengelolaan dan Pemantauan
Lingkungan Tahun (N-1) dan Rencana Biaya Tahun N, N+1, N+2
Matrix 22. Plan and Realization
of Environmental Management and Monitoring Costs for Year (N-1) and Planned
Costs for Years N, N+1, N+2
Uraian Biaya Pengelolaan dan Pemantauan
Lingkungan
Description
of Environmental Management and Monitoring Costs
Rencana dan Realisasi Tahun N-1
(Rp/USD)
Plan
and Realization Year N-1 (Rp/USD)
Rencana Tahun N (Rp/USD)
Year
Plan N (Rp/USD)
Tri. I
Quarter
I
Tri. II
Quarter
II
Tri. III
Quarter
III
Tri. IV
Quarter
IV
Total
Tri. I
Quarter
I
Tri. II
Quarter
II
Tri. III
Quarter
III
Tri. IV
Quarter
IV
Total
Rencana
Realisasi
Rencana
Realisasi
Rencana
Realisasi
Rencana
Realisasi
Rencana
Realisasi
1.
Biaya Pengelolaan Lingkungan
Environmental Management Costs
1)
Pembongkaran fasilitas tambang (jika ada)
Dismantling of mining
facilities (if any)
2)
Penataan lahan
Land planning
3)
Penghijauan, meliputi:
Greening, including:
a.
Persemaian
Nursery
b.
Penanaman
Planting
c.
Pemeliharaan (pemupukan, penyiangan, pengapuran tanah, penyulaman,
dll)
Maintenance (fertilization,
weeding, liming, replanting, etc.)
d.
Pembelian cover crop
Purchase of cover crop
4)
Pengelolaan Kualitas Lingkungan
Environmental Quality
Management
a.
Kualitas Air
Water Quality
-
Air Laut
Sea Water
-
Air Permukaan
Surface Water
-
Air Tanah
Groundwater
b.
Kualitas Udara
Air Quality
c.
Kualitas Tanah
Soil Quality
d.
Pencegahan dan penanggulangan air asam tambang
Prevention and control of acid
mine water
e.
Keanekaragaman Hayati
Biodiversity
5)
Pekerjaan sipil seperti pembuatan dam/kolam pengendap dan perawatan
kolam pengendap
Civil works such as
dam/settling pond construction and sedimentation pond maintenance
6)
Pengelolaan Limbah B3
Management of Hazardous and
Toxic Waste
7)
Biaya lainnya (Disesuaikan dengan kegiatan pengelolaan lingkungan
yang ada)
Other costs (Adjusted to
existing environmental management activities)
2.
Biaya Pemantauan Lingkungan
Environmental Monitoring Costs
a.
Pengadaan peralatan pantau
Procurement of monitoring
equipment
b.
Pengambilan sampel/contoh
Sampling/example taking
c.
Analisis laboratorium
Laboratory analysis
d.
Pelaksana pemantauan (upah tenaga kerja)
Monitoring implementer (labor
wages)
e.
Biaya lainnya (Flora Fauna, tanah, plankton dan bentos,sosek)
Other costs (Flora Fauna, land,
plankton and benthos, socio-economic)
Total Biaya Pengelolaan dan Pemantauan
Lingkungan
Total
Cost of Environmental Management and Monitoring
Uraian Biaya Pengelolaan dan Pemantauan
Lingkungan
Description
of Environmental Management and Monitoring Costs
Rencana dan Realisasi Tahun N+1
(Rp/USD)
Plan
and Realization for Year N+1 (Rp/USD)
Rencana Tahun N+2 (Rp/USD)
N+2
Year Plan (Rp/USD)
Tri. I
Quarter
I
Tri. II
Quarter
II
Tri. III
Quarter
III
Tri. IV
Quarter
IV
Total
Tri. I
Quarter
I
Tri. II
Quarter
II
Tri. III
Quarter
IIII
Tri. IV
Quarter
IV
Total
Rencana
Plan
Realisasi
Realization
Rencana
Plan
Realisasi
Realization
Rencana
Plan
Realisasi
Realization
Rencana
Plan
Realisasi
Realization
Rencana
Plan
Realisasi
Realization
1.
Biaya Pengelolaan Lingkungan
Environmental Management Costs
1)
Pembongkaran fasilitas tambang (jika ada)
Dismantling of mining facilities
(if any)
2)
Penataan lahan
Land use planning
3)
Penghijauan, meliputi:
Greening, including:
a.
Persemaian
Nursery
b.
Penanaman
Planting
c.
Pemeliharaan (pemupukan, penyiangan, pengapuran tanah, penyulaman,
dll)
Maintenance (fertilization,
weeding, liming, replanting, etc.)
d.
Pembelian cover crop
Purchase of cover crop
4)
Pengelolaan Kualitas Lingkungan
Environmental Quality
Management
a.
Kualitas Air
Water Quality
-
Air Laut
Sea water
-
Air Permukaan
Surface Water
-
Air Tanah
Groundwater
b.
Kualitas Udara
Air Quality
c.
Kualitas Tanah
Soil Quality
d.
Pencegahan dan penanggulangan air asam tambang
Prevention and control of acid
mine water
e.
Keanekaragaman Hayati
Biodiversity
5)
Pekerjaan sipil seperti pembuatan dam/kolam pengendap dan perawatan
kolam pengendap
Civil works such as
dam/settling pond construction and sedimentation pond maintenance
6)
Pengelolaan Limbah B3
Management of Hazardous and
Toxic Waste
7)
Biaya lainnya (Disesuaikan dengan kegiatan pengelolaan lingkungan
yang ada)
Other costs (Adjusted to
existing environmental management activities)
2.
Biaya Pemantauan Lingkungan
Environmental Monitoring Costs
a.
Pengadaan peralatan pantau
Procurement of monitoring
equipment
b.
Pengambilan sampel/contoh
Sampling/example taking
c.
Analisis laboratorial
Laboratory analysis
d.
Pelaksana pemantauan (upah tenaga kerja)
Monitoring implementer (labor
wages)
e.
Biaya lainnya (Flora Fauna, tanah, plankton dan bentos,sosek)
Other costs (Flora Fauna, land,
plankton and benthos, socio-economic)
Total Biaya Pengelolaan dan Pemantauan
Lingkungan
Total
Cost of Environmental Management and Monitoring
Penjelasan Matrik :
1.
Menggunakan mata uang rupiah atau mata uang asing (dollar Amerika Serikat)
secara konsisten;
2.
Biaya per triwulan bukan kumulatif dari triwulan sebelumnya.
Matrix Explanation:
1. Using rupiah or foreign currency (US
dollar) consistently;
2. Quarterly costs are not cumulative from
the previous quarter.
Sumber
(source) :
Google Translate
IIA. FORMAT FOR PREPARING WORK PLANS AND COST BUDGET FOR MINING BUSINESS LICENSE HOLDERS FOR PRODUCTION OPERATIONS ACTIVITIES AND SPECIAL MINING BUSINESS LICENSE FOR METAL MINERAL PRODUCTION OPERATIONS ACTIVITIES STAGE
Matrik 22. Rencana dan Realisasi Biaya Pengelolaan dan Pemantauan
Lingkungan Tahun (N-1) dan Rencana Biaya Tahun N, N+1, N+2
Matrix 22. Plan and Realization
of Environmental Management and Monitoring Costs for Year (N-1) and Planned
Costs for Years N, N+1, N+2
Uraian Biaya Pengelolaan dan Pemantauan
Lingkungan
|
Rencana dan Realisasi Tahun N-1
(Rp/USD)
|
Rencana Tahun N (Rp/USD)
|
|||||||||||||||||
Tri. I
|
Tri. II
|
Tri. III
|
Tri. IV
|
Total |
Tri. I
|
Tri. II
|
Tri. III
|
Tri. IV
|
Total |
||||||||||
Rencana |
Realisasi |
Rencana |
Realisasi |
Rencana |
Realisasi |
Rencana |
Realisasi |
Rencana |
Realisasi |
||||||||||
1. |
Biaya Pengelolaan Lingkungan
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
1) |
Pembongkaran fasilitas tambang (jika ada)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
2) |
Penataan lahan
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
3) |
Penghijauan, meliputi:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
a. |
Persemaian
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b. |
Penanaman
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c. |
Pemeliharaan (pemupukan, penyiangan, pengapuran tanah, penyulaman,
dll)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d. |
Pembelian cover crop
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4) |
Pengelolaan Kualitas Lingkungan
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
a. |
Kualitas Air
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- |
Air Laut
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- |
Air Permukaan
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- |
Air Tanah
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b. |
Kualitas Udara
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c. |
Kualitas Tanah
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d. |
Pencegahan dan penanggulangan air asam tambang
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e. |
Keanekaragaman Hayati
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) |
Pekerjaan sipil seperti pembuatan dam/kolam pengendap dan perawatan
kolam pengendap
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
6) |
Pengelolaan Limbah B3
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
7) |
Biaya lainnya (Disesuaikan dengan kegiatan pengelolaan lingkungan
yang ada)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
2. |
Biaya Pemantauan Lingkungan
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
a. |
Pengadaan peralatan pantau
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
b. |
Pengambilan sampel/contoh
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
c. |
Analisis laboratorium
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
d. |
Pelaksana pemantauan (upah tenaga kerja)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
e. |
Biaya lainnya (Flora Fauna, tanah, plankton dan bentos,sosek)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
Total Biaya Pengelolaan dan Pemantauan
Lingkungan
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Uraian Biaya Pengelolaan dan Pemantauan
Lingkungan
|
Rencana dan Realisasi Tahun N+1
(Rp/USD)
|
Rencana Tahun N+2 (Rp/USD)
|
|||||||||||||||||
Tri. I
|
Tri. II
|
Tri. III
|
Tri. IV
|
Total |
Tri. I
|
Tri. II
|
Tri. III
|
Tri. IV
|
Total |
||||||||||
Rencana
|
Realisasi
|
Rencana
|
Realisasi
|
Rencana
|
Realisasi
|
Rencana
|
Realisasi
|
Rencana
|
Realisasi
|
||||||||||
1. |
Biaya Pengelolaan Lingkungan
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
1) |
Pembongkaran fasilitas tambang (jika ada)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
2) |
Penataan lahan
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
3) |
Penghijauan, meliputi:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
a. |
Persemaian
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b. |
Penanaman
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c. |
Pemeliharaan (pemupukan, penyiangan, pengapuran tanah, penyulaman,
dll)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d. |
Pembelian cover crop
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4) |
Pengelolaan Kualitas Lingkungan
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
a. |
Kualitas Air
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- |
Air Laut
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- |
Air Permukaan
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- |
Air Tanah
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b. |
Kualitas Udara
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c. |
Kualitas Tanah
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d. |
Pencegahan dan penanggulangan air asam tambang
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e. |
Keanekaragaman Hayati
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) |
Pekerjaan sipil seperti pembuatan dam/kolam pengendap dan perawatan
kolam pengendap
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
6) |
Pengelolaan Limbah B3
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
7) |
Biaya lainnya (Disesuaikan dengan kegiatan pengelolaan lingkungan
yang ada)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
2. |
Biaya Pemantauan Lingkungan
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
a. |
Pengadaan peralatan pantau
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
b. |
Pengambilan sampel/contoh
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
c. |
Analisis laboratorial
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
d. |
Pelaksana pemantauan (upah tenaga kerja)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
e. |
Biaya lainnya (Flora Fauna, tanah, plankton dan bentos,sosek)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
Total Biaya Pengelolaan dan Pemantauan
Lingkungan
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Penjelasan Matrik :
1.
Menggunakan mata uang rupiah atau mata uang asing (dollar Amerika Serikat)
secara konsisten;
2.
Biaya per triwulan bukan kumulatif dari triwulan sebelumnya.
Matrix Explanation:
1. Using rupiah or foreign currency (US
dollar) consistently;
2. Quarterly costs are not cumulative from
the previous quarter.
Sumber
(source) :
Google Translate
Tidak ada komentar:
Posting Komentar