https://www.youtube.com/@agussalimnasutionmandailing2/videos

Foto saya
UNTUK KE-GUBERNUR-AN SUMATERA UTARA DARI PENDIRI UM (UNIVERSITAS MANDAILING) FOR THE PROVINCIAL GOVERNOR OF SUMATERA UTARA FROM THE FOUNDER OF MU (MANDAILING UNIVERSITY)

Jumat, 28 Februari 2025

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 01 DESEMBER 2446 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 01 DESEMBER 2446 MASEHI)

 https://www.youtube.com/@agussalimnasutionmandailing3

EVOLUSI PENDIDIKAN LOKAL MANDAILING UNTUK RENTANGAN TAHUN 2446 - 2025 = 421 (EMPAT RATUS DUA PULUH SATU) TAHUN MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA KE PERUBAHAN WAJAH PERADABAN BARU PERDAMAIAN ABADI DUNIA INTERNASIONAL GLOBAL BUMI


#SangKandidatSekjendPBBSekretarisJenderalPerserikatanBangsaBangsa #DariKantorGubernurSumutMedanKeKantorPerserikatanBangsaBangsaNewYork #SatuSatunyaTokohLegendarisSumutYangMemikirkanSumateraUtara1000SeribuTahunKeDepan #SumateraUtaraWorldMainProvincialClassRank #MembangunKegubernuranSumateraUtara #UniversitasMandailingUntukKegubernuranSumateraUtara #KearifanLokalMandailingUntukKegubernuranSumateraUtara #SeribuTahunEvolusiPendidikanMandailingUntukKegubernuranSumateraUtara





Arahan
dari 
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution


01 Desember 2446 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,

Decmber 01st, 2446 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (Mandailing University) to understands,


KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA

NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

MEMUTUSKAN :
Menetapkan : 
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.

LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151


IIC. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN BATUAN (Halaman 330)

IIC. FORMAT FOR PREPARATION OF WORK PLAN AND BUDGET FOR MINING BUSINESS LICENSE HOLDERS IN THE PRODUCTION OPERATION ACTIVITY STAGE OF ROCK GROUPS (Page 330)


Matrik 18b. Rencana dan Realisasi Penggunaan Bahan Bakar Cair

Matrix 18b. Plan and Realization of Liquid Fuel Use

 

Jenis Bahan Bakar Cair

Types of Liquid Fuel

Realisasi Tahun N-1

Realization Year N-1

Rencana Tahun N

Year Plan N

Rencana Tahun N+1

N+1 Year Plan

Rencana Tahun N+2

N+2 Year Plan

Penambangan

Mining

Penunjang

Support

Fasili tas

Facility

Penambangan

Mining

Penunjang

Support

Fasili tas

Facility

Penambangan

Mining

Penunjang

Support

Fasili tas

Facility

Penambangan

Mining

Penunjang

Support

Fasili tas

Facility

Solar/ Fuel Diesel

Jumlah (liter)

Amount (liters)

 

 

 

 

 

 

 

 

 

 

 

 

Biaya (IDR)

Cost (IDR)

 

 

 

 

 

 

 

 

 

 

 

 

Bensin/ Gasoline

Jumlah (liter)

Amount (liters)

 

 

 

 

 

 

 

 

 

 

 

 

Biaya (IDR)

Cost (IDR)

 

 

 

 

 

 

 

 

 

 

 

 

Minyak Pelumas

Lubricating Oil

Jumlah (liter)

Amount (liters)

 

 

 

 

 

 

 

 

 

 

 

 

Biaya (IDR)

Biaya (IDR)

Cost (IDR)

 

 

 

 

 

 

 

 

 

 

 

 

Biofuel

Jumlah (liter)

Amount (liters)

 

 

 

 

 

 

 

 

 

 

 

 

Biaya (IDR)

Biaya (IDR)

Cost (IDR)

 

 

 

 

 

 

 

 

 

 

 

 

Avtur

Aviation fuel

Jumlah (liter)

Amount (liters)

 

 

 

 

 

 

 

 

 

 

 

 

Biaya (IDR)

Biaya (IDR)

Cost (IDR)

 

 

 

 

 

 

 

 

 

 

 

 

Jumlah (liter)

Amount (liters)

 

 

 

 

 

 

 

 

 

 

 

 

Biaya (IDR)

Biaya (IDR)

Cost (IDR)

 

 

 

 

 

 

 

 

 

 

 

 

 

Penjelasan Matrik:

Penambangan       : konsumsi bahan bakar cair untuk kegiatan penambangan yang meliputi kegiatan

   penggalian, pemuatan, dan pengangkutan.

Penunjang              : konsumsi bahan bakar cair untuk kegiatan penunjang pertambangan seperti untuk

   kegiatan pengangkutan orang dan logistik, dll.

Fasilitas                  : konsumsi bahan bakar cair untuk fasilitas operasional tertentu seperti untuk bahan

   bakar genset.

Mining                  : liquid fuel consumption for mining activities including excavation, loading, and

transportation.

Support                : liquid fuel consumption for mining support activities such as for transporting people

   and logistics, etc.

Facilities              : liquid fuel consumption for certain operational facilities such as for generator fuel.

 

Sumber (sumber) :

Google Translate

Selasa, 18 Februari 2025

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 24 NOPEMBER 2446 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 24 NOPEMBER 2446 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing2/videos


EVOLUSI PENDIDIKAN LOKAL MANDAILING UNTUK RENTANGAN TAHUN 2446 - 2025 = 421 (EMPAT RATUS DUA PULUH SATU) TAHUN MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA KE PERUBAHAN WAJAH PERADABAN BARU PERDAMAIAN ABADI DUNIA INTERNASIONAL GLOBAL BUMI


#SangKandidatSekjendPBBSekretarisJenderalPerserikatanBangsaBangsa #DariKantorGubernurSumutMedanKeKantorPerserikatanBangsaBangsaNewYork #SatuSatunyaTokohLegendarisSumutYangMemikirkanSumateraUtara1000SeribuTahunKeDepan #SumateraUtaraWorldMainProvincialClassRank #MembangunKegubernuranSumateraUtara #UniversitasMandailingUntukKegubernuranSumateraUtara #KearifanLokalMandailingUntukKegubernuranSumateraUtara #SeribuTahunEvolusiPendidikanMandailingUntukKegubernuranSumateraUtara





Arahan
dari 
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution


24 Nopember 2446 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,

November 24th, 2446 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (Mandailing University) to understands,


KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA

NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,

MEMUTUSKAN :
Menetapkan : 
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.

LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151


IIC. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN BATUAN (Halaman 330)

IIC. FORMAT FOR PREPARATION OF WORK PLAN AND BUDGET FOR MINING BUSINESS LICENSE HOLDERS IN THE PRODUCTION OPERATION ACTIVITY STAGE OF ROCK GROUPS (Page 330)

 

Matrik 18a. (lanjutan) Rencana dan Realisasi Penggunaan Bahan Peledak

Matrix 18a. (continued) Plan and Realization of Use of Explosives

 

No.

Number

Keterangan

Information

Satuan

Unit

Rencana Tahun N

Year Plan N

Rencana Tahun N+1

N+1 Year Plan

Rencana Tahun N+2

N+2 Year Plan

Pengupasan tanah penutup/overburden /country rock UG/OP

Overburden/country rock UG/OP stripping

Penambangan UG/OP

UG/OP Mining

Pengupasan tanah penutup/overburden /country rock UG/OP

Overburden/country rock UG/OP stripping

Penambangan UG/OP

UG/OP Mining

Pengupasan tanah penutup/overburden /country rock UG/OP

Overburden/country rock UG/OP stripping

Penambangan UG/OP

UG/OP Mining

 

Sem 1

 

Sem 2

Sem 1

Sem 2

Sem 1

Sem 2

Sem 1

Sem 2

Sem 1

Sem 2

Sem 1

Sem 2

Jml

Amount

Biaya

Cost

Jml

Amount

Biaya

Cost

Jml

Amount

Biaya

Cost

Jml

Amount

Biaya

Cost

Jml

Amount

Biaya

Cost

Jml

Amount

Biaya

Cost

Jml

Amount

Biaya

Cost

Jml

Amount

Biaya

Cost

Jml

Amount

Biaya

Cost

Jml

Amount

Biaya

Cost

Jml

Amount

Biaya

Cost

Jml

Amount

Biaya

Cost

1

Target Pembongkar an batuan dengan peledakan

Rock demolition target by blasting

Ton

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

Diameter lubang ledak

Blast hole diameter

Inchi

Inches

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

Spasi antara lubang ledak

Space between blast holes

M

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

Burden lubang ledak

Blast hole burden

M

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

Kedalaman lubang ledak

Blast hole depth

M

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

Densitas Batuan

Rock Density

Kg/M 3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7

Dinamit/ booster per lubang ledak

Dynamite/ booster per blast hole

Biji

Seed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8

Detonator per lubang ledak termasuk di permukaan

Detonator per blast hole including on the surface

Biji

Seed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9

Sumbu ledak/api per lubang ledak

Blasting fuse/fire per blast hole

Meter

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

Powder factor

Kg/ M 3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

11

Jumlah lubang ledak yang akan diledakkan per hari

Number of blast holes to be blasted per day

Lubang

Hole

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12

Bahan Ramuan Bahan Peledak

Explosive Ingredients

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

….

Kg

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

13

Bahan Peledak Peka Primer

Primary Sensitive Explosives

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

……

Kg

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

14

Aksesoris Peledakan

Blasting Accessories

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

……

Kg

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

15

Detonator

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

……

Kg

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A. Data Alat Bor.

A. Drilling Tool Data.

 

No.

Number

Merek / Tipe Alat

Brand / Type of Tool

Diameter (mm)

Kedalaman (meter)

Depth (meters)

PA/MA/UA (%)

Physical Availability / Mechanical Availability / Use Of Availability (%)

Jumlah

Amount

Rencana Tahun N-1

Year Plan N-1

Realisasi Tahun N-1

Realization Year N-1

Rencana Tahun N

Year Plan N

Rencana Tahun N +1

Year Plan N +1

Rencana Tahun N +2

Year Plan N +2

Semester 1

Semester 2

Semester 1

Semester 2

Semester 1

Semester 2

1

 

 

 

 

 

 

 

 

 

 

 

 

...

 

 

 

 

 

 

 

 

 

 

 

 

 

B. Data Alat Pemuat/Loading.

B. Loading Equipment Data.

 

No.

Number

Nama Alat

Tool Name

Merek/Tipe Alat

Brand/Type of Tool

Kapasitas (ton)

Capacity (tons)

Jumlah

Amount

Rencana Tahun N-1

Year Plan N-1

Realisasi Tahun N-1

Realization Year N-1

Rencana Tahun N

Year Plan N

Rencana Tahun N +1

Year Plan N +1

Rencana Tahun N +2

Year Plan N +2

Semester 1

Semester 2

Semester 1

Semester 2

Semester 1

Semester 2

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C. Mixing Plant.

No.

Number

Nama Alat

Tool Name

Lokasi

Location

Kapasitas (ton)

Capacity (tons)

Jumlah yang di-Mixing (ton)

Mixed Amount (tons)

Rencana Tahun N-1

Year Plan N-1

Realisasi Tahun N-1

Realization Year N-1

Rencana Tahun N

Year Plan N

Rencana Tahun N +1

Year Plan N +1

Rencana Tahun N +2

Year Plan N +2

Semester 1

Semester 2

Semester 1

Semester 2

Semester 1

Semester 2

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

D. Rencana Pembangunan Fasilitas Pengangkutan, Penyimpanan/Penimbunan Bahan Peledak dan/atau Rencana Peledakan Tidur.

D. Plan for Construction of Explosive Materials Transportation, Storage/Stockpiling Facilities and/or Sleeping Blasting Plans.

 

1) Rencana Pembangunan Fasilitas Pengangkutan, Penyimpanan/Penimbunan Bahan Peledak.

1) Plan for Construction of Explosive Materials Transportation, Storage/Hoarding Facilities.

 

No.

Number

Item

Kondisi Eksisting*)

Existing Condition*)

Rencana Pembangunan

Development Plan

Rencana Tahun N

Year Plan N

Rencana Tahun N+1

N+1 Year Plan

Rencana Tahun N+2

N+2 Year Plan

1

Rencana Pembangunan Fasillitas Pengangkutan, Penyimpanan/ Penimbunan Bahan Peledak

Explosive Materials Transportation, Storage/Hoarding Facility Development Plan

 

 

 

 

 

a.

Nama/Nomor Gudang

Warehouse Name/Number

 

 

 

 

 

b.

Jenis Gudang

Warehouse Type

 

 

 

 

 

c.

Fungsi Gudang

Warehouse Function

 

 

 

 

 

d.

Bentuk Gudang

Warehouse Form

 

 

 

 

 

e.

Jenis Bahan Peledak yang Disimpan

Types of Explosives Stored

 

 

 

 

 

f.

Kapasitas Gudang

Warehouse Capacity

 

 

 

 

 

g

Lokasi Gudang

Warehouse Location

 

 

 

 

 

 

Kecamatan

Subdistrict

 

 

 

 

 

 

Kabupaten

Regency

 

 

 

 

 

 

Provinsi

Province

 

 

 

 

 

Keterangan:

Information :

 

*) Jelaskan informasi gudang bahan peledak yang telah dimiliki pada tahun berjalan

*) Explain the information on the explosives warehouse owned in the current year.

 

2) Rencana Peledakan Tidur.

2) Sleep Blast Plan.

 

No.

Number

Item

Kondisi Eksisting*)

Existing Condition*)

Rencana Peledakan Tidur

Sleep Blast Plan

Rencana Tahun N

Year Plan N

Rencana Tahun N+1

N+1 Year Plan

Rencana Tahun N+2

N+2 Year Plan

 

Rencana Pelaksanaan Peledakan Tidur

Sleep Blast Implementation Plan

 

 

 

 

 

a.

Lokasi Rencana Pelaksanaan Peledakan Tidur (Blok/Pit/Panel)

Location of Planned Blasting Implementation (Block/Pit/Panel)

 

 

 

 

 

b.

Batas maksimal waktu tidur bahan peledak

Maximum sleep time limit for explosives

 

 

 

 

 

c.

Jumlah maksimal lubang ledak yang diizinkan untuk peledakan tidur

The maximum number of blast holes permitted for sleeper blasting

 

 

 

 

 

Keterangan :

Information :

 

*) Jelaskan informasi pelaksanaan peledakan tidur yang telah dilakukan pada tahun berjalan

*) Explain the information on the implementation of sleep blasting that has been carried out in the current year.

 

Sumber (source) :

Google Translate

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 15 DESEMBER 2446 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 15 DESEMBER 2446 MASEHI)

https://www.youtube.com/@agussalimnasutionmandailing3 EVOLUSI PENDIDIKAN LOKAL MANDAILING  UNTUK RENTANGAN TAHUN 2446 - 2025  =  421 (EMPAT ...