https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN LOKAL MANDAILING UNTUK RENTANGAN TAHUN 2446 - 2025 = 421 (EMPAT RATUS DUA PULUH SATU) TAHUN MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA KE PERUBAHAN WAJAH PERADABAN BARU PERDAMAIAN ABADI DUNIA INTERNASIONAL GLOBAL BUMI
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
24 Nopember 2446 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
November 24th, 2446 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (Mandailing University) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIC. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI
PRODUKSI GOLONGAN BATUAN (Halaman 330)
IIC. FORMAT FOR PREPARATION OF
WORK PLAN AND BUDGET FOR MINING BUSINESS LICENSE HOLDERS IN THE PRODUCTION
OPERATION ACTIVITY STAGE OF ROCK GROUPS (Page 330)
Matrik 18a. (lanjutan) Rencana dan Realisasi Penggunaan Bahan Peledak
Matrix 18a. (continued) Plan and
Realization of Use of Explosives
No. Number |
Keterangan Information |
Satuan Unit |
Rencana Tahun N Year
Plan N |
Rencana Tahun N+1 N+1
Year Plan |
Rencana Tahun N+2 N+2
Year Plan |
|||||||||||||||||||||
Pengupasan tanah penutup/overburden /country rock UG/OP Overburden/country
rock UG/OP stripping |
Penambangan UG/OP UG/OP
Mining |
Pengupasan tanah penutup/overburden /country rock UG/OP Overburden/country
rock UG/OP stripping |
Penambangan UG/OP UG/OP
Mining |
Pengupasan tanah penutup/overburden /country rock UG/OP Overburden/country
rock UG/OP stripping |
Penambangan UG/OP UG/OP
Mining |
|||||||||||||||||||||
Sem 1 |
Sem 2 |
Sem 1 |
Sem 2 |
Sem 1 |
Sem 2 |
Sem 1 |
Sem 2 |
Sem 1 |
Sem 2 |
Sem 1 |
Sem 2 |
|||||||||||||||
Jml Amount |
Biaya Cost |
Jml Amount |
Biaya Cost |
Jml Amount |
Biaya Cost |
Jml Amount |
Biaya Cost |
Jml Amount |
Biaya Cost |
Jml Amount |
Biaya Cost |
Jml Amount |
Biaya Cost |
Jml Amount |
Biaya Cost |
Jml Amount |
Biaya Cost |
Jml Amount |
Biaya Cost |
Jml Amount |
Biaya Cost |
Jml Amount |
Biaya Cost |
|||
1 |
Target Pembongkar an batuan dengan peledakan Rock demolition target by
blasting |
Ton |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
Diameter lubang ledak Blast hole diameter |
Inchi Inches |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3 |
Spasi antara lubang ledak Space between blast holes |
M |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4 |
Burden lubang ledak Blast hole burden |
M |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5 |
Kedalaman lubang ledak Blast hole depth |
M |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6 |
Densitas Batuan Rock Density |
Kg/M 3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7 |
Dinamit/ booster per lubang
ledak Dynamite/ booster per blast
hole |
Biji Seed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8 |
Detonator per lubang ledak termasuk di permukaan Detonator per blast hole
including on the surface |
Biji Seed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9 |
Sumbu ledak/api per lubang ledak Blasting fuse/fire per blast
hole |
Meter |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10 |
Powder factor |
Kg/ M 3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11 |
Jumlah lubang ledak yang akan diledakkan per hari Number of blast holes to be
blasted per day |
Lubang Hole |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
12 |
Bahan Ramuan Bahan Peledak Explosive Ingredients |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
…. |
Kg |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
13 |
Bahan Peledak Peka Primer Primary Sensitive Explosives |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
…… |
Kg |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
14 |
Aksesoris Peledakan Blasting Accessories |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
…… |
Kg |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
15 |
Detonator |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
…… |
Kg |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Data Alat Bor.
A. Drilling Tool Data.
No. Number |
Merek / Tipe Alat Brand / Type of Tool |
Diameter (mm) |
Kedalaman (meter) Depth
(meters) |
PA/MA/UA (%) Physical
Availability / Mechanical Availability / Use Of Availability (%) |
Jumlah Amount |
|||||||
Rencana Tahun N-1 Year
Plan N-1 |
Realisasi Tahun N-1 Realization
Year N-1 |
Rencana Tahun N Year
Plan N |
Rencana Tahun N +1 Year
Plan N +1 |
Rencana Tahun N +2 Year
Plan N +2 |
||||||||
Semester 1 |
Semester 2 |
Semester 1 |
Semester 2 |
Semester 1 |
Semester 2 |
|||||||
1 |
|
|
|
|
|
|
|
|
|
|
|
|
... |
|
|
|
|
|
|
|
|
|
|
|
|
B. Data Alat Pemuat/Loading.
B. Loading Equipment Data.
No. Number |
Nama Alat Tool
Name |
Merek/Tipe Alat Brand/Type
of Tool |
Kapasitas (ton) Capacity
(tons) |
Jumlah Amount |
|||||||
Rencana Tahun N-1 Year
Plan N-1 |
Realisasi Tahun N-1 Realization
Year N-1 |
Rencana Tahun N Year
Plan N |
Rencana Tahun N +1 Year
Plan N +1 |
Rencana Tahun N +2 Year
Plan N +2 |
|||||||
Semester 1 |
Semester 2 |
Semester 1 |
Semester 2 |
Semester 1 |
Semester 2 |
||||||
1 |
|
|
|
|
|
|
|
|
|
|
|
… |
|
|
|
|
|
|
|
|
|
|
|
C. Mixing Plant.
No. Number |
Nama Alat Tool
Name |
Lokasi Location |
Kapasitas (ton) Capacity
(tons) |
Jumlah yang di-Mixing (ton) Mixed
Amount (tons) |
|||||||
Rencana Tahun N-1 Year
Plan N-1 |
Realisasi Tahun N-1 Realization
Year N-1 |
Rencana Tahun N Year
Plan N |
Rencana Tahun N +1 Year
Plan N +1 |
Rencana Tahun N +2 Year
Plan N +2 |
|||||||
Semester 1 |
Semester 2 |
Semester 1 |
Semester 2 |
Semester 1 |
Semester 2 |
||||||
1 |
|
|
|
|
|
|
|
|
|
|
|
… |
|
|
|
|
|
|
|
|
|
|
|
D.
Rencana Pembangunan Fasilitas Pengangkutan, Penyimpanan/Penimbunan Bahan
Peledak dan/atau Rencana Peledakan Tidur.
D. Plan for Construction of Explosive
Materials Transportation, Storage/Stockpiling Facilities and/or Sleeping
Blasting Plans.
1) Rencana
Pembangunan Fasilitas Pengangkutan, Penyimpanan/Penimbunan Bahan Peledak.
1) Plan for Construction of Explosive Materials
Transportation, Storage/Hoarding Facilities.
No. Number |
Item |
Kondisi Eksisting*) Existing
Condition*) |
Rencana Pembangunan Development
Plan |
|||
Rencana Tahun N Year
Plan N |
Rencana Tahun N+1 N+1
Year Plan |
Rencana Tahun N+2 N+2
Year Plan |
||||
1 |
Rencana Pembangunan Fasillitas Pengangkutan, Penyimpanan/ Penimbunan
Bahan Peledak Explosive Materials
Transportation, Storage/Hoarding Facility Development Plan |
|
|
|
|
|
|
a. |
Nama/Nomor Gudang Warehouse Name/Number |
|
|
|
|
|
b. |
Jenis Gudang Warehouse Type |
|
|
|
|
|
c. |
Fungsi Gudang Warehouse Function |
|
|
|
|
|
d. |
Bentuk Gudang Warehouse Form |
|
|
|
|
|
e. |
Jenis Bahan Peledak yang Disimpan Types of Explosives Stored |
|
|
|
|
|
f. |
Kapasitas Gudang Warehouse Capacity |
|
|
|
|
|
g |
Lokasi Gudang Warehouse Location |
|
|
|
|
|
|
Kecamatan Subdistrict |
|
|
|
|
|
|
Kabupaten Regency |
|
|
|
|
|
|
Provinsi Province |
|
|
|
|
Keterangan:
Information :
*) Jelaskan informasi gudang bahan peledak yang telah dimiliki pada
tahun berjalan
*) Explain the information on the
explosives warehouse owned in the current year.
2) Rencana Peledakan Tidur.
2) Sleep Blast
Plan.
No. Number |
Item |
Kondisi Eksisting*) Existing
Condition*) |
Rencana Peledakan Tidur Sleep
Blast Plan |
|||
Rencana Tahun N Year
Plan N |
Rencana Tahun N+1 N+1
Year Plan |
Rencana Tahun N+2 N+2
Year Plan |
||||
|
Rencana Pelaksanaan Peledakan Tidur Sleep Blast Implementation Plan |
|
|
|
|
|
|
a. |
Lokasi Rencana Pelaksanaan Peledakan Tidur (Blok/Pit/Panel) Location of Planned Blasting
Implementation (Block/Pit/Panel) |
|
|
|
|
|
b. |
Batas maksimal waktu tidur bahan peledak Maximum sleep time limit for
explosives |
|
|
|
|
|
c. |
Jumlah maksimal lubang ledak yang diizinkan untuk peledakan tidur The maximum number of blast
holes permitted for sleeper blasting |
|
|
|
|
Keterangan :
Information :
*) Jelaskan informasi pelaksanaan peledakan tidur yang telah dilakukan
pada tahun berjalan
*) Explain the information on the implementation of sleep blasting that
has been carried out in the current year.
Sumber (source) :
Google Translate
Tidak ada komentar:
Posting Komentar