EVOLUSI PENDIDIKAN LOKAL MANDAILING UNTUK RENTANGAN TAHUN 2446 - 2025 = 421 (EMPAT RATUS DUA PULUH SATU) TAHUN MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA KE PERUBAHAN WAJAH PERADABAN BARU PERDAMAIAN ABADI DUNIA INTERNASIONAL GLOBAL BUMI
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
17 Nopember 2446 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
November 17th, 2446 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (Mandailing University) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIC. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN BATUAN (Halaman 330)
IIC. FORMAT FOR PREPARATION OF WORK PLAN AND BUDGET FOR MINING BUSINESS LICENSE HOLDERS IN THE PRODUCTION OPERATION ACTIVITY STAGE OF ROCK GROUPS (Page 330)
Matrik 18a. Rencana dan Realisasi Penggunaan Bahan Peledak
Matrix 18a. Plan and Realization
of Use of Explosives
No. NUMBER |
Keterangan Information |
Satuan Unit |
Rencana Tahun N-1 Year
Plan N-1 |
Realisasi Tahun N-1 Realization
Year N-1 |
|||||||
Pengupasan tanah penutup/overburden/country rock UG/OP UG/OP
overburden/country rock removal |
Penambangan UG/OP UG/OP
Mining |
Pengupasan tanah penutup/overburden/country rock UG/OP UG/OP
overburden/country rock removal |
Penambangan UG/OP UG/OP
Mining |
Sisa Persediaan Bahan Peledak Remaining
Stock of Explosives |
|||||||
Jumlah Amount |
Biaya Cost |
Jumlah Amount |
Biaya Cost |
Jumlah Amount |
Biaya Cost |
Jumlah Amount |
Biaya Cost |
Jumlah Amount |
|||
1 |
Target Pembongkaran batuan dengan peledakan Rock demolition target by
blasting |
Ton |
|
|
|
|
|
|
|
|
|
2 |
Diameter lubang ledak Blast hole diameter |
Inchi Inches |
|
|
|
|
|
|
|
|
|
3 |
Spasi antara lubang ledak Space between blast holes |
M |
|
|
|
|
|
|
|
|
|
4 |
Burden lubang ledak Blast hole burden |
M |
|
|
|
|
|
|
|
|
|
5 |
Kedalaman lubang ledak Blast hole depth |
M |
|
|
|
|
|
|
|
|
|
6 |
Densitas Batuan Rock Density |
Kg/M3 |
|
|
|
|
|
|
|
|
|
7 |
Dinamit/booster per lubang
ledak Dynamite/booster per blast hole |
Biji Seed |
|
|
|
|
|
|
|
|
|
8 |
Detonator per lubang ledak
termasuk di permukaan Detonator per blast hole
including on the surface |
Biji Seed |
|
|
|
|
|
|
|
|
|
9 |
Sumbu ledak/api per lubang ledak Blasting fuse/fire per blast
hole |
Meter |
|
|
|
|
|
|
|
|
|
10 |
Powder factor |
Kg/M3 |
|
|
|
|
|
|
|
|
|
11 |
Jumlah lubang ledak yang akan diledakkan per hari Number of blast holes to be
blasted per day |
Lubang Hole |
|
|
|
|
|
|
|
|
|
12 |
Bahan Ramuan Bahan Peledak …. Explosive Ingredients …. |
Kg |
|
|
|
|
|
|
|
|
|
13 |
Bahan Peledak Peka Primer…. Primary Sensitive Explosives…. |
Kg |
|
|
|
|
|
|
|
|
|
14 |
Aksesoris Peledakan …. Blasting Accessories …. |
Buah Fruit |
|
|
|
|
|
|
|
|
|
15 |
Detonator …. |
Buah Fruit |
|
|
|
|
|
|
|
|
|
Sumber (source) :
Google Translate