https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING 421 (EMPAT RATUS DUA PULUH SATU) TAHUN DI TAHUN 2024 MEMENGARUHI KEMAJUAN PERADABAN KUALITAS DUNIA MAKRO LOKAL SUMATERA UTARA
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
15 April 2445 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
April 15th, 2445 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
LAMPIRAN II
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TANGGAL : 20 Oktober 2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA, SERTA LAPORAN PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
halaman 151
APPENDIX II
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES
REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023
DATE: October 20, 2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION, APPROVAL OF WORK PLANS AND COST BUDGET, AND REPORTS ON MINERAL AND COAL MINING BUSINESS ACTIVITIES
page 151
IIB. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN OPERASI PRODUKSI GOLONGAN MINERAL BUKAN LOGAM (halaman 248)
IIB. FORMAT FOR PREPARATION OF
WORK PLAN AND BUDGET FOR MINING BUSINESS LICENSE HOLDERS IN PRODUCTION
OPERATION ACTIVITIES OF NON-METALLIC MINERALS (page 248)
SISTEMATIKA SYSTEMATICS |
URAIAN DESCRIPTION |
||||
RINGKASAN (Executive Summary) |
|
||||
KATA PENGANTAR FOREWORD |
|
||||
DAFTAR ISI LIST OF CONTENTS |
|
||||
DAFTAR GAMBAR LIST OF FIGURES |
|
||||
DAFTAR TABEL LIST OF TABLES |
|
||||
DAFTAR LAMPIRAN APPENDIX LIST |
|
||||
BAB I CHAPTER I |
PENDAHULUAN INTRODUCTION |
|
|||
|
1.1. |
Latar Belakang Background |
berisi gambaran umum profil perusahaan, peta kesampaian daerah, bagan
struktur organisasi (head office dan site) mulai dari pengurus perusahaan (management) hingga tingkat pelaksana contains a general description
of the company profile, regional delivery map, organizational structure chart
(head office and site) starting from company management to the implementation
level |
||
|
1.2. |
Legalitas dan Pemasangan Tanda Batas Legality and Installation of
Boundary Signs |
Format 1.2 disusun dengan matrik 1, Bagan 2a, dan matrik 2b Format 1.2 is arranged with
matrix 1, Chart 2a, and matrix 2b |
||
BAB II CHAPTER II |
PERSETUJUAN DAN REALISASI RKAB TAHUN N-1 SERTA RKAB TAHUN N APPROVAL AND REALIZATION OF
WORK PLAN AND BUDGET FOR YEAR N-1 AND WORK PLAN AND BUDGET FOR YEAR N |
|
|||
|
2.1. |
Kegiatan Eksplorasi Exploration Activities |
|
||
|
|
2.1.1. |
Rekapitulasi Hasil Kegiatan Eksplorasi Sampai Tahun (N-1) Recapitulation of Exploration
Activity Results Until Year (N-1) |
format 2.1.1 sampai dengan 2.1.4 disusun dengan matrik 3a Format 2.1.1 to 2.1.4 is
arranged in matrix 3a |
|
|
|
2.1.2. |
Rencana dan Realisasi Kegiatan Eksplorasi Tahun N-1 dan Rencana Tahun
N sampai dengan Tahun (N+2) Exploration Activity Plan and
Realization for Year N-1 and Plan for Year N to Year (N+2) |
format 2.1.2 disusun dengan matrik 3b dan format 2.1.2 is composed of
matrix 3b and |
|
|
|
2.1.3. |
Rencana dan Realisasi Biaya Eksplorasi Tahun (N1) dan Rencana Tahun
(N) sampai dengan Tahun (N+2) Exploration Cost Plan and
Realization for Year (N1) and Plan for Year (N) up to Year (N+2) |
format 2.1.3 disusun dengan matrik 3c format 2.1.3 is arranged with
3c matrix |
|
|
|
2.1.4. |
Neraca Sumber Daya dan Cadangan Resource and Reserve Balance |
format 2.1.4 disusun dengan matrik 4 format 2.1.4 is arranged in
matrix 4 |
|
|
2.2. |
Konstruksi dan Infrastruktur Construction and Infrastructure |
|
||
|
|
2.2.1. |
Biaya Konstruksi dan Infrastruktur Construction and Infrastructure
Costs |
format 2.2.1 disusun dengan matrik 5a dan 5b format 2.2.1 is composed of
matrices 5a and 5b |
|
|
|
2.2.2. |
Kegiatan Penambangan Mining Activities |
|
|
|
2.3. |
Kegiatan Penambangan Mining Activities |
|
||
|
|
2.3.1. |
Metode Penambangan Mining Methods |
berisikan tentang metode penambangan yang digunakan; contains information about the
mining methods used; |
|
|
|
2.3.2. |
Rencana Perubahan Studi Kelayakan *) Feasibility Study Change Plan
*) |
berisikan tentang apakah akan ada rencana perubahan studi kelayakan
dan penjelasan mengapa melakukan perubahan studi kelayakan; contains information about
whether there will be any plans to change the feasibility study and an
explanation of why changes are being made to the feasibility study; |
|
|
|
2.3.3. |
Pengupasan dan Penimbunan Overburden/Batuan
Penutup Stripping and Filling of
Overburden/Overburden Rock |
format 2.3.3 disusun dengan matrik 6, matrik 7 dan matrik 8 format 2.3.3 is arranged with
matrix 6, matrix 7 and matrix 8 |
|
|
|
2.3.4. |
Produksi Production |
Format 2.3.4 disusun dengan matrik 9 Format 2.3.4 is composed of a 9
matrix |
|
|
|
2.3.5. |
Recovery Penambangan Mining Recovery |
Format 2.3.5 disusun dengan matrik 9 Format 2.3.5 is arranged in a 9
matrix |
|
|
|
2.3.6. |
Daftar Peralatan (Penambangan, Pengangkutan dan Penunjang),
Pengelolaan Air Tambang, dan Pengelolaan Geoteknik Tambang. List of Equipment (Mining,
Transportation and Support), Mine Water Management, and Mine Geotechnical
Management. |
Format 2.3.6 disusun dengan matrik 10a, 10c, dan 10d Format 2.3.6 is composed of
matrices 10a, 10c, and 10d. |
|
|
|
2.3.7. |
Biaya Penambangan Mining Costs |
Format 2.3.7 disusun dengan matrik 11a Format 2.3.7 is composed of
matrix 11a |
|
|
2.4. |
Pengolahan |
|
||
|
|
2.4.1. |
Metode Pengolahan Processing Method |
berisikan tentang metode pengolahan yang digunakan |
|
|
|
2.4.2. |
Hasil Pengolahan Processing Results |
Format 2.4.2 disusun dengan matrik 12a Format 2.4.2 is composed of
matrix 12a |
|
|
|
2.4.3. |
Recovery Pengolahan Recovery Processing |
Format 2.4.3 disusun dengan matrik 12a Format 2.4.3 is composed of
matrix 12a |
|
|
|
2.4.4. |
Sisa Hasil Pengolahan/Tailing Remaining Processing
Results/Tailings |
format 2.4.4 disusun dengan matrik 12b format 2.4.4 is arranged with
matrix 12b |
|
|
|
2.4.5. |
Pemanfaatan Sisa Pengolahan dan Pengelolaan Mineral Ikutan Utilization of Processing
Residues and Management of Associated Minerals |
Berisikan penjelasan tentang pemanfaatan sisa hasil pengolahan dan
pengelolaan mineral ikutan Contains an explanation of the
use of waste from processing and management of associated minerals. |
|
|
|
2.4.6. |
Daftar Peralatan Pengolahan Processing Equipment List |
Format 2.4.6 disusun dengan matrik 10b Format 2.4.6 is composed of 10b
matrix |
|
|
|
2.4.7. |
Biaya Pengolahan Processing Fee |
Format 2.4.7 disusun dengan matrik 11b Format 2.4.7 is composed of
matrix 11b |
|
|
2.5. |
Pemasaran dan Persediaan (Inventory) Marketing and Inventory |
|
||
|
|
2.5.1. |
Pemasaran dan Persediaan (Inventory) Marketing and Inventory |
Format 2.5.1 disusun dengan matrik 13a, 13b, 13c, 14a dan 14b Format 2.5.1 is arranged with
matrices 13a, 13b, 13c, 14a and 14b |
|
|
|
2.5.2. |
Biaya Pemasaran dan Persediaan (Inventory) Marketing and Inventory Costs |
Format 2.5.2 disusun dengan matrik 11c Format 2.5.2 is composed of
matrix 11c |
|
|
2.6. |
Perlindungan Lingkungan Environmental Protection |
|
||
|
|
2.6.1. |
Kegiatan Pengelolaan dan Pemantauan Lingkungan (Kegiatan Pengelolaan
dan Pemantauan Lingkungan, Pembukaan dan Reklamasi Lahan) Environmental Management and
Monitoring Activities (Environmental Management and Monitoring Activities,
Land Clearing and Reclamation) |
Format 2.6.1 disusun dengan matrik 15, 16, 17, 18 Format 2.6.1 is composed of
matrices 15, 16, 17, 18 |
|
|
|
2.6.2. |
Pemantauan Lingkungan Environmental Monitoring |
Format 2.6.2 disusun dengan matrik 19 Format 2.6.2 is composed of
matrix 19 |
|
|
|
2.6.3. |
Biaya Pengelolaan dan Pemantauan Lingkungan Environmental Management and
Monitoring Costs |
Format 2.6.3 disusun dengan matrik 20 Format 2.6.3 is composed of a
20-matrix |
|
|
2.7. |
Keselamatan Pertambangan Mining Safety |
|
||
|
|
2.7.1. |
Statistik Keselamatan Pertambangan Mining Safety Statistics |
format 2.7.1 disusun dengan matrik 21 format 2.7.1 is arranged with
matrix 21 |
|
|
|
2.7.2. |
Rencana dan Realisasi Penggunaan Bahan Peledak, Gudang Bahan Peledak,
dan Peledakan Tidur Plans and Realization of Use of
Explosives, Explosives Warehouses, and Sleeping Blasting |
format 2.7.2 disusun dengan matrik 22a format 2.7.2 is arranged with
matrix 22a |
|
|
|
2.7.3. |
Rencana dan Realisasi Penggunaan Bahan Bakar Cair Plans and Realization of Liquid
Fuel Use |
format 2.7.3 disusun dengan matrik 22b format 2.7.3 is arranged with
matrix 22b |
|
|
|
2.7.4. |
Rencana Pembangunan Tempat Penimbunan Bahan Bakar Cair Liquid Fuel Storage Site
Development Plan |
format 2.7.4 disusun dengan matrik 22c format 2.7.4 is arranged with matrix
22c |
|
|
|
2.7.5. |
Rencana Pengujian kelayakan Peralatan dan/atau Instalasi Equipment and/or Installation
Suitability Testing Plan |
format 2.7.5 disusun dengan matrik 22d format 2.7.5 is arranged with a
22d matrix |
|
|
|
2.7.6. |
Rencana Pengoperasian Kapal Keruk atau Kapal Isap Operation Plan of Dredger or
Suction Vessel |
format 2.7.6 disusun dengan matrik 22e format 2.7.6 is arranged with a
22e matrix |
|
|
|
2.7.7. |
Rencana dan Realisasi Penggunaan Bahan Berbahaya dan Beracun Plans and Realization of Use of
Hazardous and Toxic Materials |
format 2.7.7 disusun dengan matrik 22f format 2.7.7 is arranged with a
22f matrix |
|
|
|
2.7.8. |
Rencana dan Realisasi Program dan Biaya Keselamatan Pertambangan Mining Safety Program and Cost
Plan and Realization |
format 2.7.8 disusun dengan matrik 22g format 2.7.8 is arranged with
22g matrix |
|
|
2.8. |
Standardisasi dan Usaha Jasa Pertambangan Standardization and Mining
Services Business |
|
||
|
|
2.8.1. |
Standardisasi Standardization |
Format 2.8.1 disusun dengan matrik 23a Format 2.8.1 is arranged with
matrix 23a |
|
|
|
2.8.2. |
Usaha Jasa Pertambangan Mining Services Business |
Format 2.8.2 disusun dengan matrik 23b Format 2.8.2 is composed of
matrix 23b |
|
|
2.9. |
Tenaga Kerja dan Pengembangan Sumber Daya Manusia Labor and Human Resources
Development |
|
||
|
|
2.9.1. |
Penggunaan Tenaga Kerja Use of Labor |
format 2.9.1 disusun dengan matrik 24a format 2.9.1 is arranged with
matrix 24a |
|
|
|
2.9.2. |
Pelatihan Tenaga Kerja Workforce Training |
format 2.9.2 disusun dengan matrik 24b format 2.9.2 is arranged with
24b matrix |
|
|
|
2.9.3. |
Rencana Penggunaan Tenaga Kerja Asing Plans for Using Foreign Workers |
format 2.9.3 disusun dengan matrik 24c format 2.9.3 is arranged with
24c matrix |
|
|
2.10. |
Rencana dan Realisasi Pengembangan dan Pemberdayaan Masyarakat Tahun
(N-1) dan Rencana Tahun (N) sampai dengan Tahun (N+2) Community Development and
Empowerment Plan and Realization for Year (N-1) and Plan for Year (N) up to
Year (N+2) |
format 2.10 disusun dengan matrik 25 format 2.10 is arranged with
matrix 25 |
||
|
2.11. |
Pemanfaatan Produk Dalam Negeri dan Belanja Barang Utilization of Domestic
Products and Shopping for Goods |
|
||
|
|
2.11.1. |
Rencana dan Realisasi Belanja Barang dan Peralatan Tahun (N-1) dan
Rencana Tahun (N) sampai dengan Tahun (N+2)) Plan and Realization of Goods
and Equipment Expenditure for Year (N-1) and Plan for Year (N) up to Year
(N+2)) |
format 2.11.1 disusun dengan matrik 26 format 2.11.1 is arranged with
matrix 26 |
|
|
2.12. |
Keuangan dan Penerimaan Negara State Finance and Revenue |
|
||
|
|
2.12.1. |
Keuangan Finance |
format 2.12.1 disusun dengan matrik 27, 27a, 27b, 27c, 27d, 27f, 27g
dan 27h format 2.12.1 is composed of
matrices 27, 27a, 27b, 27c, 27d, 27f, 27g and 27h |
|
|
|
2.12.2. |
Penerimaan Negara State Revenue |
format 2.12.2 disusun dengan matrik 27e format 2.12.2 is arranged with
matrix 27e |
|
BAB III CHAPTER III |
RENCANA STRATEGIS LIMA TAHUN FIVE YEAR STRATEGIC PLAN |
|
|||
|
3.1. |
Kegiatan Eksplorasi Exploration Activities |
Bab III disusun dengan matrik 28 Chapter III is structured with
a matrix of 28 |
||
|
3.2. |
Produksi Production |
|
||
|
3.3. |
Pemasaran Marketing |
|
||
|
3.4. |
Lingkungan Environment |
|
||
|
3.5. |
Keselamatan Pertambangan Mining Safety |
|
||
|
3.6. |
Tenaga Kerja Labor |
|
||
|
3.7. |
Investasi Investment |
|
||
|
3.8. |
Keuangan dan Penerimaan Negara State Finance and Revenue |
|
||
LAMPIRAN-LAMPIRAN Citra satelit high resolution (natural colour) berupa raw data dan data raster (sudah terkoreksi geometrik). APPENDICES High resolution satellite
imagery (natural color) in the form of raw data and raster data
(geometrically corrected). |
Peta-peta dibuat harus dengan skala yang representatif dan
informatif. Maps must be made to a
representative and informative scale. |
||||
1. |
Peta Situasi Penambangan / Topografi Tahun (N-2),
Tahun (N-1) dan Tahun (N) dan Data Digital
(Format .PDF) Mining
Situation Map / Topography Year (N-2), Year (N-1) and Year (N) and Digital
Data (.PDF Format) |
Peta-peta dibuat harus dengan skala yang representatif dan informative Peta-peta dibuat harus dengan
skala yang representatif dan informatif |
|||
2. |
Peta Geologi Geological Map |
|
|||
3. |
Peta Sebaran Bahan Galian (modeling ore body) dan Data Digital (Format .PDF/DXF) Mining
Material Distribution Map (ore body modeling) and Digital Data (.PDF/DXF
Format) |
|
|||
4. |
Peta Eksplorasi (Hasil Pemboran) Exploration
Map (Drilling Results) |
|
|||
5. |
Peta Rencana Eksplorasi Exploration
Plan Map |
|
|||
6. |
Peta Rencana Penambangan Dilengkapi Dengan Cross Section dan Data Digital Tahun (N), (N+1), dan (N+2) dan Data
Digital (Format .PDF) Mining Plan
Map Complete with Cross Section and Digital Data for Years (N), (N+1), and
(N+2) and Digital Data (.PDF Format) |
|
|||
7. |
Peta Penimbunan Tanah/Batuan Penutup Dilengkapi
Dengan Cross Section, dan Data Digital (N-1), (N), (N+1), dan (N+2) (Format
.PDF) Overburden/Soil
Fill Map Complete with Cross Section, and Digital Data (N-1), (N), (N+1), and
(N+2) (.PDF Format) |
|
|||
8. |
Peta Peranginan (Underground)
(*) Resort Map (Underground) (*) |
|
|||
9. |
Peta Realisasi Bukaan Lahan Tahun N-1 dan Data Digital (Format .DXF); Land Opening Realization Map
Year N-1 and Digital Data (.DXF Format); |
|
|||
10. |
Peta Rencana Bukaan Lahan Tahun N; Land Opening Plan Map for Year
N; |
|
|||
11. |
Peta Realisasi Reklamasi Tahun N-1; Reclamation Realization Map for
Year N-1; |
|
|||
12. |
Peta Rencana Reklamasi Lahan Tahun N; Land Reclamation Plan Map for
Year N; |
|
|||
13. |
Peta Penyaliran Tambang, Peta Pemantauan Lingkungan Tahun N dan
Realisasi Tahun N-1 Mining Distribution Map,
Environmental Monitoring Map for Year N and Realization for Year N-1 |
|
|||
14. |
Kontrak – kontrak penjualan Sales contracts |
|
|||
15. |
Surat Pengesahan Kepala Teknik Tambang / Kepala Teknik Tambang
Sementara / Pjs. KTT (Penjabat Sementara Kepala Teknik Tambang) Letter of Approval of Mining
Engineering Chief / Temporary Mining Engineering Chief / (Temporary Mining
Engineering Chief) |
|
|||
Sumber (source) :
Google
Translate