https://www.youtube.com/@agussalimnasutionmandailing2/videos
EVOLUSI PENDIDIKAN MANDAILING 419 (EMPAT RATUS SEMBILAN BELAS) TAHUN DI TAHUN 2024
Arahan
dari
Pendiri
Bafor UM
Badan Formatur
Universitas Mandailing
Agussalim, ST bin Abdur Rahim Nasution
Instruction
from
The Founder
of
The Formatures Body
of
MU (Mandailing University)
Agussalim, ST bin Abdur Rahim Nasution
11 April 2443 Masehi, Materi KUM S3 MET (Kuliah Umum Sabtu Sore Sepanjang Masa Electronic Teleconference) “Eksistensi Jurusan Teknik Pertambangan, Fakultas Teknik Pertambangan dan Perminyakan (FTTM) UM (Universitas Mandailing) untuk memahami,
April 11th, 2443 AD, material of Public Lecture of Afternoon Saturday of All Time with Electronic Teleconference "The existence of The Department of Mining Engineering, The Faculty of Mining and Petroleum Engineering of MU (University of Mandailing) to understands,
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
REPUBLIK INDONESIA
NOMOR : 373.K/MB.01/MEM.B/2023
TENTANG
PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
NUMBER: 373.K/MB.01/MEM.B/2023ABOUTGUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :Menetapkan : KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.DECIDE :Determine :DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
NUMBER: 373.K/MB.01/MEM.B/2023
ABOUT
GUIDELINES FOR IMPLEMENTATION OF THE PREPARATION, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES
DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA,
WITH THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA,
MEMUTUSKAN :
Menetapkan :
KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL TENTANG PEDOMAN PELAKSANAAN PENYUSUNAN, EVALUASI, DAN PERSETUJUAN RENCANA KERJA DAN ANGGARAN BIAYA PADA KEGIATAN USAHA PERTAMBANGAN MINERAL DAN BATUBARA.
DECIDE :
Determine :
DECREE OF THE MINISTER OF ENERGY AND MINERAL RESOURCES CONCERNING GUIDELINES FOR IMPLEMENTING, EVALUATION AND APPROVAL OF WORK PLANS AND COST BUDGET FOR MINERAL AND COAL MINING BUSINESS ACTIVITIES.
IB. FORMAT PENYUSUNAN RKAB UNTUK PEMEGANG IUP TAHAP KEGIATAN EKSPLORASI GOLONGAN MINERAL BUKAN LOGAM
IB. FORMAT FOR PREPARING RKAB (IN BAHASA) FOR IUP HOLDERS FOR THE EXPLORATION ACTIVITIES STAGE OF THE NON-METAL MINERALS GROUP
Matrik 15. Laporan Laba Rugi
Matrix 15. Profit and Loss
Statement
No |
Uraian |
Satuan |
Tahun (N-1) |
Tahun (N) |
% Prakiraan Terhadap Rencana Tahun
(N-1) |
% Rencana Tahun (N) Terhadap Rencana
Tahun (N-1) |
||||||
|
|
|
Rencana |
Analisis Vertikal |
Realisasi |
Analisis Vertikal |
Prakiraan Realisasi |
Analisis Vertikal |
Rencana |
Analisis Vertikal |
|
|
|
|
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 = 5/1 |
10 = 7/1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Produksi |
Ton |
|
|
|
|
|
|
|
|
|
|
|
Penjualan tonase |
Ton |
|
|
|
|
|
|
|
|
|
|
|
Harga Jual/Ton |
USD |
|
|
|
|
|
|
|
|
|
|
A. |
Penjualan |
|
|
|
|
|
|
|
|
|
|
|
B |
Harga Pokok Penjualan |
|
|
|
|
|
|
|
|
|
|
|
C |
Laba kotor |
|
|
|
|
|
|
|
|
|
|
|
D |
Beban Operasi : |
|
|
|
|
|
|
|
|
|
|
|
|
Beban Penjualan |
|
|
|
|
|
|
|
|
|
|
|
|
Beban Umum |
|
|
|
|
|
|
|
|
|
|
|
|
Beban lain-lain |
|
|
|
|
|
|
|
|
|
|
|
|
Jumlah Beban Operasi |
|
|
|
|
|
|
|
|
|
|
|
E |
Laba Operasi |
|
|
|
|
|
|
|
|
|
|
|
F |
Pendapatan/(beban) lain-lain : |
|
|
|
|
|
|
|
|
|
|
|
|
Beban bunga |
|
|
|
|
|
|
|
|
|
|
|
|
Pendapatan bunga |
|
|
|
|
|
|
|
|
|
|
|
|
Beban lain-lain |
|
|
|
|
|
|
|
|
|
|
|
|
Rugi/laba selisih kurs bersih |
|
|
|
|
|
|
|
|
|
|
|
|
Jumlah pendapatan/(beban) lain-lain |
|
|
|
|
|
|
|
|
|
|
|
G |
Laba sebelum Pajak |
|
|
|
|
|
|
|
|
|
|
|
H |
Biaya Pajak Penghasilan |
|
|
|
|
|
|
|
|
|
|
|
I |
Laba Bersih |
|
|
|
|
|
|
|
|
|
|
|
1. Pos-pos rekening disesuaikan dengan kondisi perusahaan; dan
2. Cut-off realisasi sampai dengan September tahun (N-1)
Matrix Explanation:
1. Account posts are adjusted to company conditions; And
2. Cut-off realization until September (N-1)
Google Translate
Tidak ada komentar:
Posting Komentar