https://www.youtube.com/@agussalimnasutionmandailing2/videos

Foto saya
UNTUK KE-GUBERNUR-AN SUMATERA UTARA DARI PENDIRI UM (UNIVERSITAS MANDAILING) FOR THE PROVINCIAL GOVERNOR OF SUMATERA UTARA FROM THE FOUNDER OF MU (MANDAILING UNIVERSITY)

Rabu, 22 Februari 2017

KISI - KISI JBAR MGB SM 0063 MARET 2015 - 14

MENUJU BERDIRINYA UM (UNIVERSITAS MANDAILING)
TOWARDS THE ESTABLISHMENT OF MU (MANDAILING UNIVERSITY)
 
KISI-KISI KONTEN JURNAL ILMIAH UM (UNIVERSITAS MANDAILING)
TABLE OF SPECIFICATIONS OF THE SCIENTIFIC JOURNAL OF MU (MANDAILING UNIVERSITY)
JBAR MGB SM
(JURNAL BULANAN ANALISIS RISET MIKRON GEN BIOLOGIS SEPANJANG MASA)
THE MONTHLY JOURNAL OF RESEARCH ANALYSIS OF BIOLOGIC GEN MICRON OF ALL TIME
 
Maret 2015
 
Arahan Pendiri & Ketum (Ketua Umum)
MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya
Referrals from The Founder & General Chairman of
The Central (Global) Leadership Assembly of The Great Mandailing Foundation
Agussalim, ST bin Abdur Rahim Nasution


Jawabnya, saya sebagai Pendiri & Ketum (Ketua Umum) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya melakukan langkah-langkah strategis berupa pembentukan pola pikir mandiri ekonomi secara ilmiah yang saya konduksikan dalam bentuk diskusi & diskusi.
My answer, I am as The Founder & The General Chairman of The Central (Global) Leadership Assembly of The Great Mandailing Foundation undertake strategic measures such as the establishment of an economic independent mindset scientifically that I conduct in the form of discussion & discussion.

Silahkan Saudara/Saudari menilai atas kinerja para Personil MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya terhadap alur berfikir saya dalam membesarkan & membiakkan untuk mengeksiskan secara intensif kinerja MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya, yang saya muarakan kepada logika berfikir sahih dalam kesatuan rasa, kesatuan visi, & kesatuan tujuan di antara para Personil MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya.
Please Brother / Sister assess the performance of the personnel of The Central (Global) Leadership Assembly of The Great Mandailing Foundation of the groove of my think in raising & breeding for existing in intensive of performance of The Central (Global) Leadership Assembly of The Great Mandailing Foundation, its be made by me in estuary to the logic of thinking is valid in the sense of unity, unity of vision & unity of purpose among personnel of The Central (Global) Leadership Assembly of The Great Mandailing Foundation.

Naratif yang saya gunakan adalah penulisan secara berseri, berkelanjutan, & berkesinambungan melalui JBARSM (Jurnal Bulanan Analisis Riset Sepanjang Masa) secara dialektika yang cenderung referensinya berdasarkan kepada pengalaman saya sebagai aktivis mahasiswa & aktivis pemuda dari tahun 1998 sampai tahun 2008 di Kota Palembang, Sumatera Selatan - Indonesia, untuk hal yang tersebut, maka sejak tahun 2008 tepatnya pada tanggal 26 Desember 2008 saya diterima sebagai PNS (Pegawai Negeri Sipil) untuk posisi Inspektur Tambang di Pemerintah Kabupaten Mandailing Natal, Sumatera Utara - Indonesia yang pada 20 Februari 2009 saya mendeklarasikan berdirinya MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya bersama beberapa pemuda di Desa Roburan Lombang, Kecamatan Panyabungan Selatan, Kabupaten Mandailing Natal, Sumatera Utara - Indonesia.
Narrative is using by me is writing in serial, and continuous through The Monthly Journal of Research Analysis of All Time is the dialectic which tend reference is based on my experience as a student activist & youth activists from 1998 to 2008 in the city of Palembang, South Sumatra - Indonesia, for this thing, then since 2008 precisely on December 26, 2008 I was accepted as The Civil State Employee for the position of Inspector of Mines in Government of  Kabupaten Mandailing Natal, North Sumatra - Indonesia is on February 20, 2009 I declare The Central (Global) Leadership Assembly of The Great Mandailing Foundation together with some youths in Desa Roburan Lombang, Kecamatan Panyabungan Selatan, Kabupaten Mandailing Natal, Sumatera Utara - Indonesia.

Jabaran urai atas logika berfikir ilmiah saya adalah fakta yang tidak terbantahkan bahwa saya adalah insan yang suka membaca sejak Kelas 1 (satu) SD (Sekolah Dasar) Negeri 144453 Desa Roburan Lombang, Kecamatan Panyabungan Selatan, Kabupaten Mandailing Natal, Sumatera Utara - Indonesia.
Descriptions explained above my scientific thinking logic is fact indisputable that I am a man who likes to read from First Grade of Dependent Elementary School 144453 Desa Roburan Lombang, Kecamatan Panyabungan Selatan, Kabupaten Mandailing Natal, Sumatera Utara - Indonesia.

Untuk personil MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya yang menginstalasi baliho wajib menampilkan foto Pendiri & Ketum (Ketua Umum) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya dengan format sebagai berikut,
For personnel of The Central (Global) Leadership Assembly of The Great Mandailing Foundation that installs billboards required to show photo of The Founder & The General Chairman of The Central (Global) Leadership Assembly of The Great Mandailing Foundation with the following format,

1) Baliho ukuran 3 m x 2 m atau 6 m2 menampilkan 2 (dua) orang personil MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya, salah satunya adalah foto Pendiri & Ketum (Ketua Umum) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya, Agussalim, ST bin Abdur Rahim Nasution.
1) Billboards size 3 m x 2 m or 6 m2 featuring 2 (two) personnels of  The Central (Global) Leadership Assembly of The Great Mandailing Foundation, one of which is a photo of The Founder & The General Chairman of The Central (Global) Leadership Assembly of The Great Mandailing Foundation, Agussalim, ST bin Abdur Rahim Nasution.

2) Baliho ukuran 3 m x 4 m atau 12 m2 menampilkan 4 (empat) orang personil MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya, salah satunya adalah foto Pendiri & Ketum (Ketua Umum) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya, Agussalim, ST bin Abdur Rahim Nasution.     
2) Billboards size 3 mx 4 m or 12 m2 featuring 4 (four) personnel of The Central (Global) Leadership
Assembly of The Great Mandailing Foundation, one of which is a photo of The Founder & The General Chairman of The  Central (Global) Leadership Assembly of The Great Mandailing Foundation, Agussalim, ST bin Abdur Rahim Nasution.
 
3) Baliho ukuran 3 m x 6 m atau 18 m2 menampilkan 6 (enam) orang personil MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya, salah satunya adalah foto Pendiri & Ketum (Ketua Umum) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya, Agussalim, ST bin Abdur Rahim Nasution.
3) Billboards size of 3 mx 6 m or 18 m2 featuring 6 (six) personnel of The  Central (Global) Leadership Assembly of The Great Mandailing Foundation, one of which is a photo of The Founder & The General Chairman of The Central (Global) Leadership Assembly of The Great Mandailing Foundation, Agussalim, ST bin Abdur Rahim Nasution.

4) Baliho ukuran 3 m x 8 m atau 6 m x 4 m atau 24 m2 menampilkan 8 (delapan) orang personil MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya, salah satunya adalah foto Pendiri & Ketum (Ketua Umum) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya, Agussalim, ST bin Abdur Rahim Nasution.
4) Billboards size 3 mx 8 m or 6 mx 4 m or 24 m2 featuring 8 (eight) personnel of The  Central (Global) Leadership Assembly of The Great Mandailing Foundation, one of which is a photo of The Founder & The General Chairman of The Central (Global) Leadership Assembly of The Great Mandailing Foundation, Agussalim, ST bin Abdur Rahim Nasution.

MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya akan melalui fase hari ke hari, minggu ke minggu, bulan ke bulan, & tahun ke tahun, setiap saatnya zaman akan berubah demikian pula kondisi sosial masyarakat dunia Global internasional bumi, khususnya kondisi sosial masyarakat Bumi Mandailing, untuk itu MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya harus cerdas (smart) dalam mensikapi zaman agar tetap bermanfaat bagi khalayak masyarakat dunia Global internasional bumi, khususnya khalayak masyarakat Bumi Mandailing.
The Central (Global) Leadership Assembly of The Great Mandailing Foundationis going through a phase of day to day, week to week, month to month, and year after year, every time the times will change as well as social conditions more earth international Global world, especially social condition of Earth Mandailing, for The Central (Global) Leadership Assembly of The Great Mandailing Foundation must be intelligent (smart) in responding times in order to remain useful for community audiences of earth Global international world, especially the public audience in Earth Mandailing.

Tatkala saya mengkonsep rumusan organ organik organisatoris organisasi MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya, maka para Personil MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya untuk menerapkannya di lapangan riil yang sesungguhnya, utamakan kepentingan khalayak masyarakat banyak, khususnya khalayak masyarakat Bumi Mandailing dimana MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya ber-Kantor Pusat Global (Global Head Office) di Desa Roburan Lombang, Kecamatan Panyabungan Selatan, Kabupaten Mandailing Natal, Sumatera Utara - Indonesia.
When I conceptualized the formulation of organization organizationally organic organ of The Central (Global) Leadership Assembly of The Great Mandailing Foundation, then the personnel of The Central (Global) Leadership Assembly of The Great Mandailing Foundationto apply it in the real field in real, prioritizing the interests of public audience a lot, especially the public audience of Earth Mandailing  where The Central (Global) Leadership Assembly of The Great Mandailing Foundationair has Global Headquarters (Global Head Of fice) in Desa Roburan Lombang, Kecamatan Panyabungan Selatan, Kabupaten Mandailing Natal, Sumatera Utara - Indonesia.

Sambutan dari saya sebagai Pendiri & Ketum (Ketua Umum) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya, Agussalim, ST bin Abdur Rahim Nasution adalah UU (Undang-Undang) Internal MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya yang mengikat seluruh Personil MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya yang akan diuji dalam DS3M (Diskusi Sabtu Sore Sepanjang Masa) mulai pukul 14:30 WIB s.d. 16:00 WIB di pertapakan KPG (Kantor Pusat Global) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya di Kobun Banggua, Desa Roburan Lombang, Kecamatan Panyabungan Selatan, Kabupaten Mandailing Natal, Sumatera Utara - Indonesia dimana seluruh Peserta Diskusi (Audiens) menandatangani BA (Berita Acara) DS3M (Diskusi Sabtu Sore Sepanjang Masa)  yang akan dijadwalkan pada tahun 2018 yang mana kita konduksikan secara sinergis terhadap JBARSM (Jurnal Bulanan Analisis Riset Sepanjang Masa) edisi-edisi sebelumnya agar padu, namun demikian UUI (Undang-Undang Internal) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya yang ditulis dalam edisi terakhir JBARSM (Jurnal Bulanan Analisis Riset Sepanjang Masa) secara otomatis menyatakan bahwa UUI (Undang-Undang Internal) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya yang ditulis dalam edisi JBARSM (Jurnal Bulanan Analisis Riset Sepanjang Masa) sebelumnya dinyatakan tidak berlaku lagi.
Remarks from me as The Founder & The General Chairman of The Central (Global) Leadership Assembly of The Great Mandailing Foundation, Agussalim, ST bin Abdur Rahim Nasution are The Act of Internal of The Central (Global) Leadership Assembly of The Great Mandailing Foundation that binds the entire Personnel of The  Central (Global) Leadership Assembly of The Great Mandailing Foundation which will be tested in The Afternoon Saturday Discussion of All Time starting at 02:30 pm to 04:00 pm in The Site of The Global Head Office of The Central (Global) Leadership Assembly of The Great Mandailing Foundation in Kobun Banggua, Desa Roburan Lombang, Kecamatan Panyabungan Selatan, Kabupaten Mandailing Natal, Sumatera - Indonesia where all Participants of discussions (Audience) signed a Minutes of The Afternoon Saturday Discussion of All Time, which will be scheduled in 2018 in which we conduct synergistically against The Monthly Journal of Research Analysis of All Time the previous editions so compact, however The Internal Law of The Central (Global) Leadership Assembly of The Great Mandailing Foundation written  in the last issue The Monthly Journal of Research Analysis of All Time automatically declare that the Law Internal of The Central (Global) Leadership Assembly of The Great Mandailing Foundation written in ​​edition of The Monthly Journal of Research Analysis of All Time previously declared null and void.

Namun untuk sampai ke tahap UUI (Undang-Undang Internal) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya, maka seluruh edisi JBARSM (Jurnal Bulanan Analisis Riset Sepanjang Masa) dari Edisi Nomor : 0001/Januari/2010 sampai dengan Edisi Nomor : 0063/Maret/2015 harus dibahas tuntas oleh seluruh Personil MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya.
But to get to the stage of Internal Law of The Central (Global) Leadership Assembly of The Great Mandailing Foundation, then  the whole issue of The Monthly ​​Journal of Research Analysis of All Time on Issue Number : 0001 / January / 2010 to Edition No. 0063 / March / 2015 should be discussed thoroughly by all personnel of The  Central (Global) Leadership Assembly of The Great Mandailing Foundation.

Untuk itu kepada,
For that to,

1). MT (Majelis Tinggi) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya untuk meresume seluruh edisi JBARSM (Jurnal Bulanan Analisis Riset Sepanjang Masa) dari Edisi Nomor : 0001/Januari/2010 sampai dengan Edisi Nomor : 0063/Maret/2015 yang berhubungan dengan Tupoksi (Tugas Pokok & Fungsi) MT (Majelis Tinggi) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya.
1). The Upper Assembly of The Central (Global) Leadership Assembly of The Great Mandailing Foundation to resume the whole issue of The Monthly Journal of Research Analysis of All Time on Issue Number: 0001 / January / 2010 to the Issue Number: 0063 / March / 2015 related to the Auth (Main Duty & Function) of The Upper Assembly of The Central (Global) Leadership Assembly of The Great Mandailing Foundation.

2). MPO (Majelis Pertimbangan Organisasi) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya untuk meresume seluruh edisi JBARSM (Jurnal Bulanan Analisis Riset Sepanjang Masa) dari Edisi Nomor : 0001/Januari/2010 sampai dengan Edisi Nomor : 0063/Maret/2015 yang berhubungan dengan Tupoksi (Tugas Pokok & Fungsi) MPO (Majelis Pertimbangan Organisasi) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya.
2). The Organization Advisory Assembly of The Central (Global) Leadership Assembly of The Great Mandailing Foundationto resume the whole issue of The MonthlyJournal of Research Analysis of All Time on Issue Number: 0001 / January / 2010 to the Issue Number: 0063 / March / 2015 related to the Auth (Main Duty & Function) of The Organization Advisory Assembly of The Central (Global) Leadership Assembly of The Great Mandailing Foundation.

3). Depem (Dewan Pembina) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya untuk meresume seluruh edisi JBARSM (Jurnal Bulanan Analisis Riset Sepanjang Masa) dari Edisi Nomor : 0001/Januari/2010 sampai dengan Edisi Nomor : 0063/Maret/2015 yang berhubungan dengan Tupoksi (Tugas Pokok & Fungsi) Depem (Dewan Pembina) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya.
3). The Trustee Council  of The Central (Global) Leadership Assembly of The Great Mandailing Foundationto resume the whole issue of The Monthly Journal of Research Analysis of All Time on Issue Number: 0001 / January / 2010 to the Issue Number: 0063 / March / 2015 related to the Auth (Main Duty & Function) of The Trustee Council of The Central (Global) Leadership Assembly of The Great Mandailing Foundation.

4). KK (Komisi Konstitusi) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya untuk meresume seluruh edisi JBARSM (Jurnal Bulanan Analisis Riset Sepanjang Masa) dari Edisi Nomor : 0001/Januari/2010 sampai dengan Edisi Nomor : 0063/Maret/2015 yang berhubungan dengan Tupoksi (Tugas Pokok & Fungsi) KK (Komisi Konstitusi) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya.
4). The Constitution Commission of The Central (Global) Leadership Assembly of The Great Mandailing Foundationto resume the whole issue of JBARSM ​​(Journal Monthly Analysis Research of All Time) on Issue Number: 0001 / January / 2010 to the Issue Number: 0063 / March / 2015 related to the Auth (Main Duty & Function) of The Constitution Commission of The Central (Global) Leadership Assembly of The Great Mandailing Foundation.

5). KY (Komisi Yudisial) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya untuk meresume seluruh edisi JBARSM (Jurnal Bulanan Analisis Riset Sepanjang Masa) dari Edisi Nomor : 0001/Januari/2010 sampai dengan Edisi Nomor : 0063/Maret/2015 yang berhubungan dengan Tupoksi (Tugas Pokok & Fungsi) KY (Komisi Yudisial) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya.
5). The Judicial Commission of The Central (Global) Leadership Assembly of The Great Mandailing Foundationto resume the whole issue of The Monthly Journal of Research Analysis of All Time on Issue Number: 0001 / January / 2010 to the Issue Number: 0063 / March / 2015 related to the Auth (Main Duty & Function) The Judicial Commission of The  Central (Global) Leadership Assembly of The Great Mandailing Foundation.

6). KP (Komisi Pengawas) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya untuk meresume seluruh edisi JBARSM (Jurnal Bulanan Analisis Riset Sepanjang Masa) dari Edisi Nomor : 0001/Januari/2010 sampai dengan Edisi Nomor : 0063/Maret/2015 yang berhubungan dengan Tupoksi (Tugas Pokok & Fungsi) KP (Komisi Pengawas) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya.
6). The Supervisory Commission of The Central (Global) Leadership Assembly of The Great Mandailing Foundationto resume the whole issue of The Monthly Journal of Research Analysis of All Time on Issue Number: 0001 / January / 2010 to the Issue Number: 0063 / March / 2015 related to the Auth (Main Duty & Function) The Supervisory Commission of The Central (Global) Leadership Assembly of The Great Mandailing Foundation.

7). Dekeh (Dewan Kehormatan) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya untuk meresume seluruh edisi JBARSM (Jurnal Bulanan Analisis Riset Sepanjang Masa) dari Edisi Nomor : 0001/Januari/2010 sampai dengan Edisi Nomor : 0063/Maret/2015 yang berhubungan dengan Tupoksi (Tugas Pokok & Fungsi) Dekeh (Dewan Kehormatan) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya.
7). The Honorary Council of The Central (Global) Leadership Assembly of The Great Mandailing Foundationto resume the whole issue of The Monthly Journal of Research Analysis of All Time on Issue Number: 0001 / January / 2010 to the Issue Number: 0063 / March / 2015 related to the Auth (Main Duty & Function) of The Honorary Council of The Central (Global) Leadership Assembly of The Great Mandailing Foundation.

8). Depen (Dewan Penasihat) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya untuk meresume seluruh edisi JBARSM (Jurnal Bulanan Analisis Riset Sepanjang Masa) dari Edisi Nomor : 0001/Januari/2010 sampai dengan Edisi Nomor : 0063/Maret/2015 yang berhubungan dengan Tupoksi (Tugas Pokok & Fungsi) Depen (Dewan Penasihat) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya.
8). The Advisory Council of The Central (Global) Leadership Assembly of The Great Mandailing Foundationto resume the whole issue of The Monthly Journal of Research Analysis of All Time on Issue Number: 0001 / January / 2010 to the Issue Number: 0063 / March / 2015 related to the Auth (Main Duty & Function) of The Advisory Council of The Central (Global) Leadership Assembly of The Great Mandailing Foundation.

9). Depak (Dewan Pakar) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya untuk meresume seluruh edisi JBARSM (Jurnal Bulanan Analisis Riset Sepanjang Masa) dari Edisi Nomor : 0001/Januari/2010 sampai dengan Edisi Nomor : 0063/Maret/2015 yang berhubungan dengan Tupoksi (Tugas Pokok & Fungsi) Depak (Dewan Pakar) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya.
9). The Expert Council of The Central (Global) Leadership Assembly of The Great Mandailing Foundationto resume the whole issue of The Monthly Journal of Research Analysis of All Time on Issue Number: 0001 / January / 2010 to the Issue Number: 0063 / March / 2015 related to the Auth (Main Duty & Function) of The Expert Council of The Central (Global) Leadership Assembly of The Great Mandailing Foundation Foundation.

Saya memahami atas keterbatasan fasilitas yang dimiliki oleh MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya, namun demikian saya mengunggulkan semangat para Personil MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya untuk mengeksiskan masa depan MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya, yang dalam kaitan yang ada sekarang, kita harus mengoptimalkan sumber daya yang ada seoptimal mungkin dalam mencapai tujuan & sasaran yang akan kita capai yaitu mendirikan UM (Universitas Mandailing) Kualifikasi Dunia (World Qualification ).
I understand the above limitations of facilities owned by The Central (Global) Leadership Assembly of The Great Mandailing Foundation, however, I favor the spirit of the Personnel of The Central (Global) Leadership Assembly of The Great Mandailing Foundation to existing  future of The Central (Global) Leadership Assembly of The Great Mandailing Foundation, which in terms of the present, we must optimize existing resources optimally to achieve the goals & objectives that we will achieve that is set up MU (Mandailing University) World Qualification.

Sampai saat ini sumber anggaran dana MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya tidak ada, saya percaya bahwa semangat para Personil MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya adalah sumber keberlangsungan masa depan MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya dalam merintis UM (Universitas Mandailing) Kualifikasi Dunia (World Qualification  ).
Until now the source of budgetary of funds of The Central (Global) Leadership Assembly of The Great Mandailing Foundationdid not exist, I believe that the morale of personnel of The Central (Global) Leadership Assembly of The Great Mandailing Foundationis the source of the sustainability of the future of The Central (Global) Leadership Assembly of The Great Mandailing Foundation Mandailing  Kingdom Foundation  in pioneering MU (Mandailing University) World Qualification.

Dalam DS3M (Diskusi Sabtu Sore Sepanjang Masa) mulai pukul 14:30 WIB s.d. 16:00 WIB di pertapakan KPG (Kantor Pusat Global) MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya di Kobun Banggua, Desa Roburan Lombang, Kecamatan Panyabungan Selatan, Kabupaten Mandailing Natal, Sumatera Utara - Indonesia dimana seluruh Peserta Diskusi (Audiens) menandatangani BA (Berita Acara) DS3M (Diskusi Sabtu Sore Sepanjang Masa) banyak hal yang akan kita diskusikan yang berhubungan dengan intensifikasi profesionalitas para Personil MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya yang kita diskusikan secara intensif & berkelanjutan.
In The Afternoon Saturday Discussion of All Time starting at 02:30 pm to 04:00 pm in The Site of The Global Head Office of The Central (Global) Leadership Assembly of The Great Mandailing Foundation in Kobun Banggua, Desa Roburan Lombang, Kecamatan Panyabungan Selatan, Kabupaten Mandailing Natal, Sumatera - Indonesia where all Participants of discussions (Audience) signed a Minutes ofThe Afternoon Saturday Discussion of All Time many things that will be discussed related to the intensification of the professionalism of the personnel of The  Central (Global) Leadership Assembly of The Great Mandailing Foundation which we discussed in intensive & sustained.

Tampilnya para Personil MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya yang mengambil peran dalam beberapa posisi kepemimpinan di Desa Roburan Lombang adalah efek positif yang diresonansikan oleh MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya, saya bangga akan proses diskusi yang dilaksanakan oleh MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya mampu membentuk pola pikir dan membangun karakter (character building) yang dapat diterima oleh khalayak masyarakat luas, khususnya khalayak masyarakat di Desa Roburan Lombang.
The emergence of Personnel of The  Central (Global) Leadership Assembly of The Great Mandailing Foundationis taking part in several leadership positions in Desa Roburan Lombang is the positive effect that resonanced by The Central (Global) Leadership Assembly of The Great Mandailing Foundation I  am proud to be a process of discussion held by The Central (Global) Leadership Assembly of The Great Mandailing Foundationis able to establish a mindset and build character (character building) which can be accepted by the public audience, especially public audience in Desa Roburan Lombang.

Saya tidak ambisius menghantarkan para Personil MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya merebut jabatan publik, tetapi saya lebih bersemangat bila para Personil MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya dapat diterima keberadaannya oleh khalayak masyarakat luas, khususnya khalayak masyarakat di Bumi Mandailing.
I am not ambitious deliver the Personnel of The Central (Global) Leadership Assembly of The Great Mandailing Foundation catcth public official, but I am more excited when the Personnel of The Central (Global) Leadership Assembly of The Great Mandailing Foundation acceptable existence by a wide public audience, especially public audience in Earth Mandailing.

Tingginya animo khalayak masyarakat di Bumi Mandailing dalam merespon positif kehadiran MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya adalah modal kita untuk meningkatkan eksistensi & formula selanjutnya atas upaya membangun Bumi Mandailing melalui MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya, saya akan terus sabar dalam mengarahkan, membimbing, & mengasuh para Personil MPP(G) YMR, Majelis Pimpinan Pusat (Global) Yayasan Mandailing Raya agar berdaya guna & berhasil guna dalam membangun sumber daya Bumi Mandailing untuk membangun NKRI (Negara Kesatuan Republik Indonesia).
High interest of public audience on Earth Mandailing  in response to the positive presence of The Central (Global) Leadership Assembly of The Great Mandailing Foundation is our capital to improve the existence & further formula efforts to build the Earth Mandailing  through The Central (Global) Leadership Assembly of The Great Mandailing Foundation, I will continue to wait in directing, guiding, & nurturing Personnel of The Central (Global) Leadership Assembly of The Great Mandailing Foundationto be efficient & effective in building the resources of Earth Mandailing  to build the Homeland (The Unitary State of the Republic of Indonesia).

Pada tanggal 26 Oktober 2014 s.d. tanggal 01 Nopember 2014 saya mengikuti Diklat (Pendidikan & Pelatihan) "Reklamasi & Pasca Tambang" yang diadakan oleh Kementerian Energi & Sumber Daya Mineral, Direktorat Mineral & Batubara, Teknik & Lingkungan, dengan Teori di Hotel Sintesa Peninsula Palembang, Jalan Abdul Rozak dan Praktek di Desa Musilandas, Kabupaten Banyuasin, Sumatera Selatan - Indonesia yang dalam hal ini didapatkan,
On October 26th, 2014 to dated November 01st, 2014 I attended Training (Education & Training) "Reclamation and Mine Closure" held by the Ministry of   Energy and Mineral Resources, Directorate of   Mineral of Coal, Engineering, & Environment, with Theory in Sintesa Peninsula Hotel, Palembang, Jalan Abdul Rozak and Practice The Village Musilanda, Regency of Banyuasin, South Sumatra - Indonesia, which in this case is obtained,

KAMUS ISTILAH TAMBANG.
GLOSSARY OF TERMS OF MINE.

Representative sample conto yang mewakili, yaitu sejumlah conto yang diambil dengan pemerataan & dianggap dapat mewakili suatu lapisan batubara tertentu untuk analisis & penilaian endapan batubara.
representative sample samples representative, namely a number of   samples taken to equity & are considered to represent a specific coal seam for the analysis & assessment of  coal sludge.


reserve sama dengan cadangan (lihat cadangan).

reserve equal to the backup (see backup).

reserve base bagian dari sumber batubara yang telah dikenal & memenuhi kriteria fisika serta kimia tertentu sesuai praktek pertambangan & teknologi produksi saat ini, kriteria yang dipenuhi termasuk kualitas kedalaman, ketebalan, peringkat, & jarak ke titik pengukuran.
reserve base part of the  known coal resources &  meet specific criteria in physics and chemistry accordance mining practices & current production technology, which met the criteria including the quality of   depth, thickness, rank, & the distance to the point of  measurement.

residual ash abu residu, bahan mineral dalam batubara yang tertinggal setelah pembakaran sempurna.
residual ash residue ash, minerals in the coal that remains after complete combustion.

residual geologic materials bahan-bahan residu geologi, lapisan batuan alas dari lapisan batubara atau lapisan bahan galian lainnya yang masih berada di tempat semula (tempat terbentuk) & tidak diangkut oleh air atau angin ataupun akibat gayanya.
residual geologic materials residual geological materials, layers of   pedestal rock of   coal layer or layers of other minerals that is still in its original place (a form) & not transported by water or wind or due to its style.

residum massa halus (tanah) yang tidak berstruktur dengan butiran-butiran mikroskopisnya yang tidak dapat larut, terdiri atas partikel-partikel berukuran 1-2 mikron atau kurang, tidak tembus cahaya, & berwarna gelap, micrinite rendah.
residum smooth mass (ground) which is not structured with microscopic granules which are insoluble, consists of   particles measuring 1-2 microns or less, opaque, & dark, low micrinite.

resinite maceral batubara dalam kelompok exinite, terdiri atas bahan-bahan damar, sering berbentuk elips atau jarum yang menunjukkan adanya bahan-bahan pengisi sel atau bahan-bahan damar.
resinite coal maceral in exinite group, composed  of resin materials, often elliptical or needle that indicates cell filler materials or resin materials.

resinoid nama kelompok untuk maceral-maceral dalam seri resinite.
resinoid name of the  group to macerals in resinite series.

resinous coal batubara damaran, yaitu batubara yang biasanya berumur lebih muda yang mengandung bahan damar dalam jumlah besar.
resinous coal resinous coal, coal is usually a younger age containing resin material in large quantities.

resource sumber-sumber yang terbentuk secara geologi di areal geografi tertentu, ukuran kuantitatif dari bagian-bagian  isi batubara yang terdapat di suatu wilayah dipandang memiliki potensi untuk ditambang secara menguntungkan dengan teknologi yang tersedia & keadaan ekonomi saat ini.
resource sources formed geologically in a particular geographic area, a quantitative measure of the  parts of content of the  coal contained in an area considered to have the potential to be mined profitably with available technology & current economic conditions.

respirable coal dust debu batubara yang dapat terhisap & terendapkan di dalam paru-paru  pada proses pernafasan, ukuran partikel batubara ini sekitar 0,1 - 5,0 mikron, & mengandung silika.
respirable coal dust coal dust that can be inhaled & deposited in the lungs in the respiratory process, coal particle size is about 0.1 to 5.0 microns, & containing silica.

restoration restorasi yang berarti proses untuk memulihkan lahan ke dalam keadaan semula sehingga kegunaannya lebih besar, lebih produktif, baik secara estetika & mengurangi pencemaran.
restoration restoration means the process of restoring the land to its original state so that its usefulness is bigger, more productive, both in aesthetics & reduce pollution.

restricted resource bagian-bagian dari sumber yang dibatasi atau dilarang ditambang sesuai ketentuan perundang-undangan yang berlaku.
restricted resource portions of the source which is restricted or prohibited mined in accordance with the applicable legislation.

retinite istilah umum untuk fosil dari jenis-jenis damar atau  kelompok fosil damar dengan ragam komposisi (dengan kandungan 6% - 15%), dicirikan oleh tidak adanya asam succinic & dijumpai dalam batubara berumur lebih muda (seperti batubara coklat) atau gambut.
retinite general term for fossils of the  types of  resins or a resin fossil group with composition variety (with a content of   6% - 15%), characterized by the absence of  succinic acid found  in coal and younger age (such as brown coal) or peat.

revegetation revegetasi, yaitu kegiatan menanami & menumbuhkan tanaman di areal yang terganggu oleh operasi penambangan, tanaman yang dipilih adalah jenis-jenis lokal atau tanaman lain yang sesuai pada awal revegetasi, misalnya tanaman yang cepat tumbuh.
revegetation revegetation, ie activities planting & growing crops in areas disturbed by mining operations, selected  plants are the types of local or other suitable crops at the beginning of   revegetation, for example is fast-growing plants.

ripper batang baja berujung lancip yang dipasang di bagian belakang bulldozer (traktor) untuk memecahkan (membajak) lapisan batuan atau batubara keras, alat yang memakai batang pembajak yang ditarik oleh traktor, bulldozer (traktor) yang dilengkapi dengan batang pembajak sering disebut ripper.
ripper pointy toes steel rod mounted on the rear of the bulldozer (tractor) to solve (plow) layer of  rock or hard coal, a tool that uses stem hijackers being pulled by a tractor, bulldozer (tractor) equipped with a pirates rod often called a ripper.

ripping pekerjaan memecahkan lapisan batuan atau batubara dengan bulldozer (traktor) yang menggunakan batang pembajak (ripper).
ripping job solving the layer of  rock or coal with bulldozer (tractor) which uses hijackers stem (ripper).

rippling bentuk permukaan bergelombang dari batuan, biasanya batu pasir, batu lumpur, & batu lempung akibat gerakan atau aliran air yang dangkal pada waktu lapisan tersebut masih dalam keadaan lembut.
rippling form of undulating surface of the  rock, usually sandstone, silt, & clay stone due to the movement or water flow of he  shallow at the time of the  layer is still in a sof t state.

RKL pengelolaan (kelola) lingkungan, dokumen AMDAL yang berisi rencana, uraian, & tata cara pengelolaan lingkungan pada waktu penambangan berlangsung maupun pada pasca-tambang.
RKL (in Bahasa) management (governance) of environment, the EIA (the Environment Impact Analysis) document containing plans, descriptions, and procedures for environmental management at the time of mining takes place as well as on post-mining.

rock texture tekstur batuan, yaitu bentuk fisik atau sifat batuan secara umum & bentuk ikatan antara butiran atau kristal pembentuk batubara.
rock texture rock texture, the physical form or characteristics of   rock in general & form of a bond between the grains or crystals forming coal.

rock type bahan-bahan berlapis (membentuk tempelan) dari batubara.
rock type layered materials (forming patches) from coal.

rock units unit geologi dari batuan yang karena jenisnya yang berbeda-beda, sifat mineral atau kandungan fosilnya, dapat ditelusuri & dipetakan dengan mudah dapat dibedakan dengan unit batuan di atas serta di bawahnya.
rock units geological unit of he  rock that because of the  different species, the nature of   mineral or fossil content, can be traced &  mapped can easily be distinguished by rock units above and below it.

roll tonjolan yang memanjang batuan serpih, lanau, batu pasir, atau batu gamping dari atap ke dalam lapisan batubara, sehingga menipiskan bahkan adakalanya menggantikan lapisan batubara, tonjolan juga dapat berasal dari lapisan batuan  lantai ke atas sehingga menipiskan atau menggantikan posisi lapisan batubara.
roll protrusion that extends of shale rock, silt, sandstone, or limestone from the roof   into the coal seam, thereby diluting sometimes even replace coal seams, bulge can also be derived from the floor to the top of the  rock layers thereby diluting or replacing coal seam.

rom-coal batubara rom (lihat batubara rom).
rom- coal rom coal (see coal rom).

roof   sama dengan atap (lihat atap).
roof the same  with the roof   (see the roof ).

roof bolt baut atap, baut dengan penjepit (jangkar) yang digunakan untuk memperkuat lapisan batuan atap.
roof bolt  roof  bolt, bolt with a clamp (anchor) used to reinforce the roof  rock layers.

root clay lempung akar, lempung di bawah lapisan batubara yang dicirikan oleh terdapatnya fosil akar-akar dari tumbuhan pembentuk batubara.
root clay root loam, clay below the coal seam that is characterized by the presence of  roots fossilized of coal-forming plants.

royalty istilah untuk iuran produksi atas bahan galian yang dihasilkan oleh kegiatan/perusahaan pertambangan, bagian produksi yang harus diserahkan kepada pemerintah oleh perusahaan pertambangan batubara yang beroperasi dalam bentuk PKP2B, umumnya 13,5% dari jumlah produksi.
royalty terms for production fees on minerals produced by the activities / mining companies, part of the  production to be submitted  to the government by coal mining companies that operate in the form of PKP2B (in Bahasa), generally 13.5% of   total production.

RPL Rencana Pemantauan Lingkungan, yang merupakan salah satu dokumen AMDAL yang berisi rencana, uraian, & tata cara pemantauan lingkungan pada waktu penambangan berlangsung, maupun pada pasca tambang.
RPL (in Bahasa) Environmental Monitoring Plan, which is one of The  EIA (Environment Impact Analysis) document containing plans, descriptions, & procedures for environmental monitoring at the time mining takes place, as well as on post-mining.

rumus Dulong rumus (dulong formula) untuk menghitung nilai panas kotor batubara dengan menggunakan analisis proksimat.
Dulong formula formula (Dulong formula) to calculate the gross heat value of  coal by using proximate analysis.

rumus parr rumus atau metoda paling sederhana untuk menentukan jumlah bahan mineral dalam batubara dengan menghitung kandungan abu & belerang, rumus parr : bahan mineral = kelembaban (kadar air) + 1,08 + 0,55 belerang.
parr formula simplest formula or method for determining the amount of   mineral matter in coal by calculating the ash & sulfur content, parr formula : minerals = humidity (moisture) + 1.08 + 0.55 sulfur.

run off sebagian dari air tercurah (air hujan) yang mengalir di atas permukaan lahan, untuk menyebutkan pilar batubara lapisan curam yang ambruk.
run off portion of  gushing water (rain water) that flows over the land surface, to mention  the coal pillars of steep layers of collapsed.

run-of-mine hasil produksi batubara kasar (lihat batubara rom).
run-of-mine production of  coarse coal (see rom coal).

run-of-mine sample conto batubara kasar (yang belum diolah) atau conto yang diambil dari alat angkut.
run-of-mine sample coarse coal samples (unprocessed) or samples taken from the conveyance.

s sulfur atau sulphur, persentase dari unsur & senyawa belerang dalam batubara.
s sulfur or sulphur, the percentage of elements & compounds of sulfur in coal.

safety factor faktor keamanan dari lereng/teras penambangan terbuka, angka perbandingan untuk menentukan kemantapan lereng yang tergantung pada tahanan geser material, tahanan gelinding, sifat air tanah, & sifat batuan, secara matematika safety factor adalah perbandingan antara stres ultimat dengan stres kerja.
safety factor safety factor of the  slope / terrace of open pit mining, comparative figures to determine slope stability depends on material shearing resistance, roll resistance, the nature of   ground water, &properties of  rocks, mathematically safety factor is the ratio between the ultimate stress at work stress.

sample conto (sampel), bagian kecil dari sejumlah produksi atau lapangan batubara yang diambil dengan cara tertentu/baku (diakui secara ilmiah dan resmi), dikemas, & kemudian dianalisis di laboratorium untuk mengetahui jenis, kualitas, komposisi, & sifat-sifatnya.
sample sample (sample), a small part of a number of   production or coal field taken in a certain way / raw (scientifically and officially recognized), packaged, and then analyzed in the laboratory to determine the type, quality, composition, and properties.

sample reduction pengurangan (reduksi) conto, yaitu proses pengurangan jumlah (berat) conto untuk memudahkan penanganannya tetapi masih memenuhi persyaratan conto yang mewakili, pengurangan dapat dilakukan secara manual, misalnya membagi 4 (empat) bagian (quartering) atau secara mekanis, misalnya dengan menggunakan kotak pembagi (riffle box).
sample reduction reduction (reduction) of samples, namely reduction of the amount (weight) of samples for easy handling but still meet the requirements of samples that represent, the reduction can be carried out manually, for example, split 4 (four) parts (quartering) or mechanically, for example by using divider box (riffle box).

sampling accuracy akurasi perconto atau ketepatan perconto, suatu conto batubara dalam mewakili sejumlah (lapisan) batubara tempat conto diambil.
sampling accuracy sample accuracy or sample precision, a sample of coal in representing a number (layer) of coal of samples place taken.

sampling errors kesalahan perconto, penyimpangan hasil analisis conto akibat kesalahan pengambilan, pengukuran atau kesalahan analisis conto.
sampling errors sample error, deviation of sample results analysis due to improper of collection, measurement or sample analysis error.

sand-size butiran batuan yang berukuran pasir, berdiameter antara 0,05 mm - 2,00 mm.
sand-size grains of sand-sized rocks, a diameter of between 0.05 mm - 2.00 mm.

sandstone batuan yang berbentuk butir-butir yang melekat (tersemenkan) atau terpadatkan, terdiri dari butiran-butiran kuarsa berukuran pasir (0,05 mm - 2,0 mm).
sandstone rock in the form of  beads attached (cemented) or compacted, consisting of  grains of   sand-sized quartz (0.05 mm - 2.0 mm).

saringan alat penyaringan batubara bersih untuk memperoleh ukuran-ukuran batubara yang siap dijual atau siap untuk proses selanjutnya, biasanya merupakan saringan getar.
sieve clean coal screening tool for obtaining measures of coal ready for sale or ready for the next process, usually a vibrating sieve.

saringan getar alat penyaringan batubara yang bekerja dengan getaran yang dihasilkan oleh putaran pada sumbu eksentrik atau sumbu yang diberi ganjalan.
vibrating sieve coal screening tool that works with the vibration generated by the rotation of the  eccentric axis or axes are given wedge.

saringan goyang alat penyaring gerusan batubara dengan goyangan yang dihasilkan oleh putaran atau goyangan sumbu atau alas eksetrik, dioperasikan di laboratorium.
sieve filter coal scours sieve tool produced  by the rotation or axis shake or pedestal eksetrik, operated in the laboratory.

satshex akronim dari Saturday, Sunday, and  holidays excluded, merupakan salah satu ketentuan untuk waktu/hari pemuatan kapal dimana jumlah hari pemuatan tidak termasuk hari Sabtu, Minggu, & hari libur umum.
satshex acronim of   Saturday, Sunday, and holidays excluded, is one of the  conditions for the time / day of   loading of the  ship where the number of  days of loading excluding Saturdays, Sundays, & public holidays.

scheduling penjadwalan atau tatanan tahapan-tahapan kegiatan pertambangan untuk meminimalkan waktu setiap tahap maupun keseluruhan waktu operasi.
scheduling scheduling or order of the  stages of the  mining activities to minimize the time each stage and the overall operating time.

scoria sekoria atau  skoria, lempung atau serpih yang terbakar karena persentuhan dengan bahan panas dari gunung berapi, digunakan sebagai bahan permukaan jalan.
scoria sekoria or skoria, clay or shale burning because of   exposure to the heat of  volcanic material, used as a road surface material.

scoria land areal sekoria yang dicirikan oleh adanya lapisan-lapisan batubara yang terbakar.
scoria land sekoria area which is characterized by the presence of  layers of   burning coal.

screen jaringan dengan permukaan berbentuk jaring (mesh) atau batang untuk memisahkan butiran-butiran yang berukuran berbeda-beda, terbuat dari baja, lentur, tahan abrasi, atau karet tahan abrasi, saringan dapat bekerja dengan getaran atau goyangan.
screen network with a surface shaped nets (mesh) or rods to separate the grains of   different size, made of steel, flexible, abrasion resistant or abrasion  resistant  rubber, the filter can work with vibration or oscillation.

screen analysis penghitungan persentase butir-butir batubara hasil penggerusan & penyaringan untuk mengetahui sifat-sifat fisik batubara bila digerus.
screen analysis calculating the percentage of   grains of   coal of crushing & screening results to determine the physical properties of coal when crushed.

screening efficiency effisiensi penyaringan dari hasil penggerusan, yaitu perbandingan berat batubara (dan bahan lain) yang lolos saringan dengan berat batubara (bahan lain) yang disaring.
screening efficiency filtration efficiency of the grinding result, the weight ratio of coal (and other materials) that pass the filter with a weight of coal (other ingredients) are filtered.

screening pekerjaan memisahkan partikel batubara atau material lainnya hasil penggerusan untuk memperoleh beberapa jenis ukuran yang sama atau hampir sama menggunakan saringan, pekerjaan memasang jaringan kawat atau pagar pada permukaan lereng atau  ke atap lubang tambang untuk mencegah guguran batu lepas.

screening employment separates the coal particles or other material of grinding results to obtain some kind of the  same size, or nearly the same using a sieve, the job put wire network or fence on the slope surface or into the the roof of mine pit to prevent loose rock avalanches.

screen shaking saringan goyang, saringan mekanis yang bergerak mundur-maju atau berputar untuk menggerakkan & meloloskan material melalui lubang saringan.
screen shaking shake sieve, mechanical sieve moving back-forth or rotating to move & pass the material through a sieve holes.

screen vibrating saringan getar, alat penyaring mekanis yang bergetar untuk menggerakkan & meloloskan material melalui lubang-lubang saringan.
screen vibrating vibrating sieve, vibrating mechanical filter tool to move & pass the material through sieve holes.

scrubber peralatan untuk membersihkan gas buangan dari pembakaran batubara, peralatan fisika & kimia untuk membuang senyawa belerang dari gas buangan hasil pembakaran batubara untuk pembangkit listrik, biasanya mengikat belerang pada gas buangan dengan bahan kimia sehingga menjadi senyawa tidak beracun, kemudian dibuang.
scrubber equipment for cleaning exhaust gases from  the combustion of coal, physics and chemistry equipment to dispose of sulfur compounds from exhaust gases of combustion  of coal for electricity generation, typically bind sulfur in the exhaust gas to chemicals that become not toxic compounds, then discarded.

seam lapisan batubara, suatu pelapisan tipis bila dibandingkan dengan tebalnya batuan di suatu wilayah geologi yang dapat terbagi menjadi 2 (dua) atau lebih lapisan, secara terpisah atau digabung merupakan endapan batubara yang biasanya layak ditambang, lapisan bahan galian mineral logam.
seam coal seam, a thin coating when compared with thickness of the rock in a geological formation that can  be divided into 2 (two) or more layers, separately or combined  is coal deposition usually worth mined, metallic minerals excavated  material layer.

seam contour kontur lapisan, yaitu garis yang menghubungkan titik-titik pada atap lantai lapisan batubara yang mempunyai tinggi yang sama di atas permukaan laut atau di atas titik dasar yang ditentukan (datum).
seam contour layers contour, the line connecting the dots on the roof  of coal seam floor that has the same height above sea level or above the specified base point (datum).

seam structure struktur lapisan, yaitu ciri fisik dari lapisan batubara yang meliputi ketebalan, bahan pengotor, batuan antara lapisan, kekar, bidang geser & jenisnya, ciri fisik akan mempengaruhi metode penambangan, pemilihan peralatan ekstraksi batubara, cara peledakan, & sistem pengolahan.
seam structure layer structure, the physical characteristics of  the coal seam which include thickness, impurity, rocks between layers, stocky, field of sliding & type, physical characteristics will affect the method  of  mining, coal extraction equipment selection, blasting method, & system processing.

secondary ash abu luar atau abu tambahan, abu yang berasal dari bahan mineral yang meresap ke dalam belahan & rongga batubara.
secondary ash outer gray or addition gray, the ash derived from mineral materials that seep into parts & cavities of coal.

secondary blasting peledakan dari bongkah-bongkah hasil peledakan untuk memperkecil hasil pemecahan sehingga dapat (mudah) diangkut, digerus, dimuat, atau diolah selanjutnya.
secondary blasting blasting of blocks of blasting results to minimize thebreakdown products that can (easily) be transported, crushed, loaded, or processed further.

secondary crusher mesin penggerusan untuk lebih memperkecil ukuran material hasil penggerusan pertama, pada batubara penggerusan batubara tahap kedua menghasilkan ukuran lolos saringan 50 mm, berupa gelundung ganda (double roll crusher).
secondary crusher crushing machine to further reduce the size of the  first material grinding results, the coal of the second stage of grinding coal produces 50 mm sieve size, in the form of   a double roll crusher.

secondary crushing penggerusan batubara atau bahan galian lain untuk memperkecil ukuran sehingga lolos saringan 50 mm (ukuran siap jual sesuai permintaan pasar secara umum).
secondary crushing crushing coal or other minerals so as to minimize the size of 50 mm sieve (size ready to be sold according to market demand in general).

secondary fuel bahan bakar/turunan kedua, yaitu bahan bakar yang dihasilkan dari proses pemanfaatan bahan bakar lainnya (bahan bakar primer), misalnya listrik dari batubara, minyak, atau gas alam.
secondary fuel fuel / second derivative, ie fuels produced from the use process of other fuels (primary fuel), for example, electricity from coal, oil, or natural gas.

secondary pyrite pirit yang dapat terlihat pada batubara yang biasanya terdapat dalam bentuk kristal berwarna kuning.
secondary pyrite pyrite that can be seen on the coal that is usually found in the form of   yellow crystals.

sediment bahan endapan, bahan dalam bentuk tanah atau butiran-butiran halus hasil penghancuran batuan secara kimia atau fisika oleh air, angin, es, atau organisme, bahan padat yang diendapkan dari suspensi dalam media cairan.
sediment deposition materials, materials in the form of  ground or fine granules results in the destruction of   chemical or physical rock by water, wind, ice, or organism, solid material precipitated from the suspension in a liquid medium.

sedimentary sedimenter, proses, bahan-bahan, atau pelapisan yang berkaitan dengan atau terdiri dari batuan atau pecahan-pecahan mineral.
sedimentary sedimentary, processes, materials, or coating pertaining to or composed of   rock or fragments of  mineral.

sedimentary ash abu luar atau abu tambahan, bahan mineral yang masuk ke dalam batubara saat pengumpulan bahan pembentuk batubara (sebelum batubara terbentuk).
sedimentary ash exterior ash or additional gray, mineral materials that go into the coal when the coal-forming material collection (before coal is formed).

sedimentary environment lingkungan sedimenter, yaitu keadaan geografi, fisika, kimia, & biologi saat pengumpulan endapan (sedimen) terjadi.
sedimentary environment sedimentary environment, namely the state of   geography, physics, chemistry, &biology while collecting sediment occurs.

sedimentary peat gambut sedimenter, yaitu gambut yang terjadi di dalam air, terutama di dalam danau, dari ganggang & tumbuh-tumbuhan lainnya.
sedimentary peat sedimentary peat, peat is happening in the water, especially in the lake, from algae & other vegetation.

sedimentation ponds kolam pengendapan, yaitu kolam buatan untuk mengendapkan padatan dari air tambang termasuk air hujan yang turun ke dalam bukaan tambang terbuka untuk mencegah pencemaran pada perairan umum tempat pengaliran air tambang, pemusatan kolam pengendapan & pengoperasian kolam biasanya merupakan kewajiban perusahaan pertambangan yang dicantumkan dalam ANDAL & RKL.
sedimentation ponds settling ponds, namely artificial ponds to precipitate solids from  mine water including rain water that fell into an open pit mine openings to prevent pollution in public waters where mine water drainage, concentration of  settling ponds & the operation of the  pond is usually an obligation of mining company listed in the EIA (in English) & RKL (in Bahasa)

sediment control structure bangunan pengendalian sedimen, yaitu bangunan (struktur) untuk membuang sedimen dari sistem pembersihan atau aliran air, bangunan ini umumnya didirikan di kompleks tambang terbuka untuk mencegah pencemaran sungai di sekitar areal pertambangan.
sediment control structure sediment control building, namely the building (structure) to remove the sediment of cleaning systems or water flow, these buildings are generally established in the complex of open pit to prevent pollution of   rivers around the mining area.

sediment pond kolam endap, yaitu kolam yang dirancang untuk mengendapkan bahan-bahan padat dari air buangan tambang (air tercemar oleh tanah & bahan padat lainnya), settling pond & sedimen basin.
sediment pond sedimentation pond, the pond is designed to precipitate solid materials from mining waste water (water polluted by soil & other solid material), settling pond & basin sediments.

seepage peresapan, pergerakan air melalui tanah tanpa meninggalkan jalur-jalur (saluran yang jelas), gerakan karena gaya berat air dengan lambat menerobos tanah.
seepage infiltration, movement of water through the soil without leaving tracks (clear channel), because gravity movement of  water with a slow break through the soil.

segregation segregasi, pemisahan tanah atau tanah kupasan di tempat buangan atau tempat penumpukan.
segregation segregation, separation of  soil or ground peelings in a discharge or a buildup.

semianthracite semiantrasit atau setengah antrasit, batubara yang mengandung 86% - 92% karbon tetap, batubara semi antrasit mempunyai peringkat methamorf, antara batubara bitumen & antrasit, walaupun sebenarnya sifat fisiknya lebih dekat kepada antrasit.
semianthracite semiantrasit or semi-anthracite, coal containing 86% - 92% fixed carbon, semi-anthracite coal have methamorf  rank, between bituminous coal & anthracite, although the actual physical properties closer to anthracite.

semibituminous coal batubara semibitumen, yaitu batubara dengan peringkat di antara batubara bitumen & semi antrasit yang lebih keras & lebih rapuh dari batubara bitumen, peringkat di antara batubara bitumen dengan antrasit, mengandung rata-rata 10% - 20% zat terbang.
semibituminous coal semibitumen coal, coal is ranked among the bituminous coal & semi-anthracite are harder & more brittle than bituminous coal, rank among bituminous coal with the anthracite, contains an average of   10% - 20% volatile matter.

serpih bakaran serpih karbonan yang telah lama tertumpuk dari hasil buangan tambang batubara dalam & terbakar dengan sendirinya (terbakar spontan) mengakibatkan perubahan menjadi bahan seperti klinker atau kerak.
burnt shale carbonaceous shale which has long pile of waste products in the coal mines & burning by itself (burning spontaneously) resulted in changes to the materials such as clinker or slag.

serpih karbonan serpih berwarna gelap yang mengandung bahan karbonan, biasanya batuan ini berhubungan dengan lapisan batubara (terdapat dekat atau kontak dengan lapisan batubara).
carbonaceous shale dark shale containing carbonaceous material, usually this rock is associated with coal seams (located close to or in contact with a layer of coal).

sesar patahan, yaitu rekahan atau zona rekahan (patahan) yang memperlihatkan pergeseran pada 2 (dua) atau lebih bidang yang tadinya merupakan 1 (satu) bidang.
fault fracture, ie fracture or zone of   fractures (faults) which shows a shift in the 2 (two) or more fields that had been the 1 (one) field.

setara batubara energi panas dari bahan bakar non-batubara yang dinyatakan dengan energi panas yang dihasilkan oleh batubara.
coal equivalent heat energy from non-coal fuels are declared  to the heat energy generated by coal.

setara ton batubara energi panas dari bahan bakar non-batubara yang dinyatakan sama dengan energi panas yang dihasilkan oleh 1 (satu) ton batubara dengan nilai kalori 7.000 kkal/kg.
tons of coal equivalent heat energy from non-coal fuels are declared  equal to thermal energy generated by 1 (one) ton of   coal with a calorific value of  7,000 kcal / kg.

settling pond kolam endap (sediment pond) (lihat sediment pond).
settling pond sedimentation pond (sediment pond) (see the sediment pond).

sf stowage factor, yaitu perbandingan antara isi dengan berat muatan sebelum muatan mencapai draft maximum, untuk batubara sf adalah sekitar 0,0014 m3 (kubik) per ton, safety factor (lihat safety factor).
sf stowage factor, ie the ratio between the  contents with  the weight of cargo before the cargo reaches maximum draft, for coal sf is approximately 0.0014 m3 (cubic) per ton, safety factor (see safety factor).

shaft sumuran, yaitu lubang masuk ke tambang dalam  yang tegak lurus dari permukaan atau miring, diperlengkapi dengan lift tambang atau bila miring dapat diperlengkapi dengan rel & lori tarik dengan katrol khusus, bentuk penampang lubang umumnya empat persegi panjang atau bulat.
shaft pittings, namely a hole into the underground mine an upright from surface or inclined, equipped with a mines lift or when tilted can be equipped with a rail and truck pull with a special pulley, cross-sectional shape of  the  hole generally rectangular or round.

shaft mine tambang sumuran, jenis tambang dalam batubara dengan jalan masuk berupa sumuran  tegak  lurus mencapai lapisan batubara yang terletak relatif dalam.
shaft mine mine wells, the type of coal  underground mine in the form of  way of  perpendicular drive pitting to reach coal seams are located relatively deep.

shale serpih, yaitu bahan endapan (sedimen) yang terbentuk dari lempung atau lanau, serpih dapat juga berarti batuan sedimen yang terdiri atas butiran-butiran berukuran lempung & lanau, merupakan batuan sedimen yang paling sering ditemukan.

shale shale, namely the material of deposition (sediments) were formed from clay or silt, shale can also mean sedimentary rock consisting of grains measuring clay & silt, is a sedimentary rock that is most of  ten found.

shale parting lapisan serpih yang memisahkan lapisan-lapisan batubara (lapisan antara / lapisan pemisah).
shale parting shale layers that separate layers of coal (between of the layer / separator layer).

shale shaker penyaringan serpih yang berarti saringan dalam aliran lumpur pemboran putar, berbentuk saringan getar, terpasang miring yang akan dilalui oleh aliran lumpur pemboran untuk dibersihkan, kemudian dialirkan kembali ke lubang pemboran.
shale shaker shale filtering which means the filter in the flow of rotary drilling mud, shaped vibrating sieve, mounted sloping to be traversed by the flow of  drilling mud to be cleaned, and then channeled back into the drilling hole.

shale coal batubara serpihan (lihat batubara serpihan).
shale coal coal of fragments (see flakes coal).

shank alat yang dipasang pada bulldozer atau traktor untuk memecah (membajak) lapisan batuan, ripper.
shank tool mounted on a bulldozer or a tractor to break (plow) layers of rock, ripper.

shex sunday & holidays exclude, ketentuan tambahan pada kontrak pengapalan batubara atau kargo lainnya yang menetapkan bahwa jumlah hari untuk pemuatan kapal tidak termasuk hari-hari minggu & libur umum.
shex sunday & holidays exclude, additional provisions in the contract of shipment of  coal or other cargo which stipulates that the number of days for the loading of the ship is not including Sundays & public holidays.

shield support penyangga berpayung atau penyangga dengan kanopi, yaitu alat-alat penyangga hidrolik di permuka tambang pada sistem lubang buka (longwall) untuk tambang batubara dalam, salah satu jenis penyangga atap hidrolik (powered roof support) yang dipandang sebagai alat yang paling aman  karena pelat baja penyangga terdapat di atas, samping, & belakang, tetapi harganya sangat mahal.
shield support umbrella buffer or buffer with a canopy, namely tools of hydraulic buffer in surface of open  pit mine system (longwall) for coal underground mines, one type of  hydraulic roof  support (powered roof support) which is seen as the safest tool for buffer plate steel contained in the top, side, & rear, but the price is very expensive.

shift gilir atau gilir kerja, yaitu waktu kerja yang merupakan bagian dari 24 jam (sehari-semalam) untuk operasi / pekerja tambang, pabrik atau industri lainnya, gilir kerja biasanya terbagi 2 (dua) sampai 4 (empat) (10 - 12 jam, 8 jam, & 6 jam) yang disebut gilir pagi / siang / malam atau gilir 1, 2, 3, & 4.
shift shift or work shift, ie working time, which is part of the 24 hours (day and night) for the operation / miners, factory or other industry, work shift normally divided into 2 (two) to 4 (four) (10-12 hours, 8 hours, and 6 hours) the so-called shift of morning / afternoon / evening or shift 1, 2, 3, & 4.

shinc sunday & holidays included, merupakan ketentuan tambahan dalam kontrak pengapalan batubara atau kargo lainnya yang menetapkan bahwa jumlah hari untuk pemuatan kapal termasuk hari-hari minggu & libur umum.
shinc sunday & holidays included, an additional provision in the contract of shipment of  coal or other cargo which stipulates that the number of  days for the loading of  ships, including Sundays & public holidays.

shooting penembakan, peledakan (blasting), khususnya peledakan lapisan batuan penutup.
shooting shooting, blasting, in particular blasting overburden layer.

short ton satuan berat, 0,907 metrik ton (907 kg) atau 2.000 pon.
short ton unit of weight, 0.907 metric ton (907 kg) or 2,000 pounds.

shovel alat berat yang mempunyai bak (ember) pengeruk untuk menggali & memuat batuan lepas dengan gerakan pengerukan ke arah depan, alat berat ini model lama beroperasi dengan tenaga listrik atau mesin diesel yang mempunyai kabel-kabel penggerak bak, tetapi alat model baru pada umumnya bertenaga diesel & menggerakkan alat gali secara hidrolik.
shovel heavy equipment having a bath (bucket) of scraper to dig & load the loose rock with dredging movement  towards the front, heavy equipment is old model operated by electricity or diesel engines that have a tub drive cables, but new models tools are generally powered diesel & moves excavator with hydraulic.

shovel dozer traktor yang mempunyai bak (ember) penggali & pemuat, atau alat gali & alat muat yang mempunyai trek baja sebagai penggerak.
shovel dozer tractor that has a bath (bucket) of excavator & loader, or excavator & loading tools that have steel tracks as a driver.

shovel loader traktor yang mempunyai alat pemuat, pendorong, & alat muat dengan jangkauan tinggi & biasanya dengan ban karet, alat dengan mekanisme pemuatan dari depan ke arah pengemudi disebut backhoe loader.
shovel loader tractor has tools of loader, plunger, & fit tools with a high range & usually with rubber tires, tool with loading mechanism from the front to the driver called a backhoe loader.

si strength index (indeks kekuatan), kekuatan relatif dari kokas yang diproses dari batubara dengan peringkat serta jenis-jenis berbeda.
si the strength index (index of   strength), the relative strength of coke is processed from coal by rank as well as different types.

slide slopes sudut lereng dari sisi pembuangan tanah, kanal atau bendungan yang dinyatakan umumnya dengan angka perbandingan antara kemiringan dengan garis tegak.
slide slopes slope angle of the disposal of  land, canals or dams that expressed generally with comparative figures between the slope of the straight line.

slidewall core conto inti atau conto batuan bor yang diambil dengan cara menembakkan tabung perconto khusus ke dinding lubang bor atau dengan alat mekanis.
slidewall core core samples or drill rock samples were taken by firing a particular sample tube to the walls of the borehole or by mechanical means.

sidewall sampling proses pengambilan conto inti dari dinding lubang bor yang biasanya dilakukan dengan menembakkan tabung perconto khusus ke dinding lubang yang ditarik ke permukaan.
sidewall sampling process of   taking core samples from the walls of  the borehole is usually carried out by firing special sample tube to the walls of  the  hole that was pulled to the surface.
 
sieve analysis analisis penyaringan, screen analysis (lihat screen analysis), dilakukan terhadap butiran-butiran hasil penyaringan lebih halus, misalnya sampai 200 mesh.
sieve analysis screening analysis, screen analysis (see screen analysis), conducted on granules of finer screening results, for example to 200 mesh.

sieve blending penutupan saringan karena bahan yang disaring lengket menutupi permukaan / lubang-lubang saringan disebut juga screen blending.
sieve blending closure sieve due the sticky substance covering the surface / the sieve holes also called screen blending.

silicfied wood kayu tersilica, yaitu bahan terbentuk akibat penggantian kayu oleh silika dalam proses sedemikian rupa sehingga bentuk kayu masih dipertahankan, umumnya dalam bentuk opal atau kalsedon, lazimnya ditemukan dalam lapisan batuan yang mengandung batubara.
silicfied wood silicfied timber, which is material formed by the replacement of wooden by silica in the process such that the timber shape is retained, generally in the form of opal or chalcedony, typically found  in rock layers that contain coal.

silt lanau, bahan sedimen atau disebut tanah berat yang butirannya berukuran garis tengah 0,0039 mm - 0,0625 mm terendap dari cairan atau suspensi.
silt silt, sediment materials called heavy ground granulated sized center line 0.0039 mm - 0.0625 mm deposited from a liquid or suspension.


siltation pengendapan lanau, proses penambahan bahan endapan halus dalam jumlah di atas normal pada air permukaan akibat erosi oleh air larian pada permukaan tanah yang sebelumnya telah terdapat gangguan karena kegiatan manusia.

siltation the deposition of silt, the process of adding fine sediment material in the amount of   above normal on the surface of the  water due to erosion by flowing water on the surface of the  land that had previously been found to interference from human activities.

 

siltation pond kolam pengendapan lanau, yaitu kolam yang dibuat untuk menangkap & mengendapkan lanau yang di bawa oleh air larian dengan tujuan mencegah pencemaran air permukaan alam atau perairan umum.

siltation pond silt sedimentation pond, which is a pool that was made to capture & precipitate the silt is carried by flowing water with the aim of   preventing pollution of   natural surface water or public waters.

silting pelanauan, pengisian dengan bahan berbentuk tanahan atau lumpur yang diendapkan air.
silting, silting, fillingwith shaped of  material or mud deposited  by water.

silt-size particles partikel (butiran) berukuran lanau, partikel berukuran 0,0039 mm - 0,0625 mm.
silt-size particles particle (grain) with size of  silt, particles measuring 0.0039 mm - 0.0625 mm.

siltstone batu lanau, batuan yang terbentuk dari butiran-butiran berukuran antara lempung & pasir (0,0035 mm - 0,0625 mm).
siltstone rock silt, rocks formed from granules sized between clay & sand (0.0035 mm - 0.0625 mm).

simper surat izin mengemudi (di lingkungan) perusahaan, surat izin atau kartu  izin mengoperasikan alat-alat berat & kendaraan penumpang biasa di lingkungan izin pertambangan yang dikeluarkan oleh perusahaan.

simper  license (in the around) of company, license or permit cards operate heavy equipment & ordinary passenger vehicles within the mining permit issued by the company.

singkapan out crop (lihat outcrop).
out crop outcrop (see outcrop).

sink-float process proses penenggelaman-pengapungan yaitu proses pencucian batubara dengan pemisahan batubara bersih dari bahan pengotor oleh cairan berat berupa suspensi air bercampur bahan logam, bahan akan terapung di atas cairan dengan berat jenis tinggi tersebut & kotoran akan tenggelam.
sink-float process drownings-flotation process is the process of washing the coal with clean coal separation of   impurities by weight in the form of a liquid as suspension of water mixed metal material, the material will float on liquid with high specific gravity & dirt that will sink.

site investigation penelitian lokasi (situs), penelitian atau penyelidikan atas lahan & penyelidikan geologi pada lokasi pertambangan baru dengan tujuan memperoleh data untuk keperluan perancangan fondasi serta fasilitas permukaan.
site investigation study locations (sites), research or investigation on land & geological investigations on new mining sites in order to obtain data for the design of foundations and surface facilities.

site plan peta lokasi, peta dengan skala tertentu yang menunjukkan lokasi yang direncanakan (disarankan) untuk tambang terbuka atau pembuatan sumuran tambang dalam.
site plan location map, a map with a scale that shows the location of the  planned (recommended) for the open pit mine or manufacture of   underground mine shaft.

size analysis analisis ukuran, screen analisis (lihat screen analisis).
size analysis size analysis, screen analysis (see screen analysis).

size consist jenis ukuran, analisis saringan untuk ukuran butiran batubara.
size consist size type, sieve analysis for grain size of the coal.

sized coal batubara tersaring, yaitu batubara yang disaring di antara ukuran-ukuran tertentu, batubara yang dipilih menurut ukuran-ukuran tertentu.
sized coal filtered coal, ie coal screened between certain sizes, coal is chosen according to certain sizes.

size reduction pengurangan atau memperkecil ukuran, penggerusan batubara ukuran besar (biasanya batubara rom) dengan penggerusan awal (primary crusher) atau penggerusan tahap kedua dengan secondary crusher.
size reduction or decrease the size reduction, grinding coal of large size (usually rom coal) with initial grinding (primary crusher) or scour the second stage with the secondary crusher.

slacking peretakan atau pemecahan lignit & batubara sub-bitumen di udara terbuka akibat pengeringan alami.
slacking cracking or splitting lignite and sub-bituminous coal in the open air due to natural drying.

slag terak, bahan kotoran yang terbentuk dari proses reduksi sering dilakukan dengan bahan pereduksi kokas.
slag slag, waste material formed from the reduction process is often carried out with reducing agents of coke.

slake index indeks kemantapan batuan yang ditentukan berdasarkan uji ketahanan atas peregangan atau gesekan dengan bahan sedikit lebih keras.
slake index rock stability index is determined based on the endurance test on stretching or friction with the material with a little harder.

slickensides permukaan batuan yang terpoles & tergores/tertoreh secara alami akibat adanya 2 (dua) massa batuan yang bergesekan atau 1 (satu) batuan menggelincir di atas yang lain.
slickensides rock surfaces polished  & etched naturally due to the 2 (two) rock mass rubbing against or 1 (one) of  rock slips over another.

slip tumpukan atau massa limbah tambang yang bergerak (longsor) ke arah bawah akibat gaya beratnya, terjadi karena limbah bersifat liat & mengalami pembebanan/penekanan, bila tumpukan ini berada dekat aliran sungai, longsoran dapat membendung sungai yang pada akhirnya dapat menimbulkan banjir bila longsoran ini dihancurkan oleh air.
slip heaps or mine waste mass that moves (landslide) downward due to gravity, occurs because the waste is tough & experienced loading / suppression, when the stacks are located close to streams, avalanches can dam the river, which in turn can cause flooding when this avalanche destroyed by water.

slope lereng atau permukaan yang miring (membentuk sudut dengan bidang datar), biasanya bentuk kemiringan dari bukaan (permuka) tambang terbuka, di dalam geometri tambang terbuka lereng ini mempunyai batasan (terukur) mengikuti kaidah mekanika batuan (kemantapan lereng) & ketentuan pemerintah.
slope slope or sloping surfaces (forming an angle with the horizontal plane), usually form of the slope of the  openings (surface) of open pit mine, in the open pit geometry this slope has a limit (measured) follow the rules of   rock mechanics (slope stability) & government regulations.

slope failure kelongsoran lereng, kerusakan, longsoran, atau keruntuhan lereng penambangan atau tumpukan limbah penambangan.
slope failure sliding downhill, damage, avalanches, or collapse of mining slope or mining waste pile.

slope instability ketidakmantapan lereng, keadaan lereng teras-teras bekas tambang yang rawan longsor atau keruntuhan karena sudut lerengnya lebih dari 200.
slope instability slope instability, the state of the  slope terraces of former mine which is prone to landslides or collapse due to the slope angle of over 200.

slope mine tambang lereng, yaitu bukaan tambang yang miring (membentuk lereng) untuk mencapai lapisan batubara, sumuran miring menuju lapisan batubara pada tambang dalam.
slope mine incline mine, mine openings that are angled (forming slope) to reach coal seams, pitting tilted toward coal seam at the mine.

slope stability kemantapan lereng (lihat kemantapan lereng).
slope stability slope stability (see the stability of the  slope).

slope wash bahan dalam bentuk tanah atau batuan yang telah berpindah ke bawah lereng karena gaya berat & aliran air tidak terkumpul dalam alur.
slope wash material in the form of   soil or rock that has moved down  the slope due to gravity & the flow of   water is not accumulated  in the groove.

sof t-structure coal batubara struktur lembut, batubara bitumen yang mengandung zat terbang rendah & mempunyai kekar-kekar serta bentuk belahan-belahan (celah-celah) yang jelas.
soft-structure coal soft structure of coal, bituminous coal containing low volatile matter & had a stocky muscular and form hemispheres (cracks) are clear.

soil tanah, bahan-bahan alami di permukaan yang gembur, terbentuk karena pelapukan batuan di tempat atau melapuk & terbawa oleh angin, air, atau berpindah karena gaya beratnya.
soil ground, natural materials in the loose surface, formed by the weathering of   rocks in place or decaying & carried away by wind, water, or move because of   gravity.

soil cement campuran tanah dengan semen padu yang digunakan untuk melindungi lereng.
soil-cement mixture of ground with solid cement that is used to protect the slopes.

Soil conservation konservasi (pengawetan) tanah, yaitu perlindungan terhadap tanah dari erosi atau terhadap kerusakan kimia terutama terhadap kehilangan kesuburan.

soil conservation conservation of  (preservation) of   land, ie the protection of   soil from erosion or against chemical damage, especially to the loss of   fertility.
soil material bahan tanah yang telah bebas dari bahan garam-garaman larut & mampu menimbulkan pertumbuhan tanaman.

soil material earth  materials that are free from  salts material are soluble & capable of causing the growth of  plants.
soil permeability kelulusan tanah, kemampuan lapisan tanah untuk meluluskan air atau udara.
soil permeability soil graduation, the ability of the  soil layer to pass water or air.

soil productive capacity kemampuan produktif tanah, sifat alami tanah yang dapat mempertahankan sifat-sifatnya dari kerusakan akibat adanya kegiatan tambang terbuka.
soil productive capacity of  productive capability of   land,  nature of  soil that can retain its properties from damage due to open-pit mining activities.

soil prof ile penampang tanah, penampang tegak tanah dari permukaan sampai kedalaman yang mencakup seluruh pelapisan-pelapisannya.
soil prof ile cross section of the ground, vertical section of the  surface soil to a depth that covers the entire coatings.

soil reconstruction pembentukan kembali lapisan-lapisan tanah dengan mengambil tanah terpilih dari tempat lain yang memungkinkan & memenuhi persyaratan geologi, pekerjaan ini sama dengan reklamasi pasca tambang terbuka, tetapi lapisan-lapisan tanah untuk pengurukan mungkin bukan berasal dari tanah kupasan penambangan.
soil reconstruction re-establishment of the  layers of   soil by taking soil selected from other places that allow & meet the requirements of   geology, this work is the same as the post-mining of reclamation open pit mine, but the layers of   soil to backfill may not come from the mining peelings ground.

soil stabilization pemantapan tanah (stabilisasi tanah) dengan cara kimia & mekanis dengan tujuan memelihara atau menambah stabilitas massa tanah atau memperbaiki sifat-sifat teknis tanah.
soil stabilization stabilization of soil (soil stabilization) by chemical & mechanical means with the purpose of  maintaining or add to the stability of   soil mass or improve the engineering properties of  soil.

soil structure struktur tanah, gabungan atau pengaturan butiran-butiran tanah primer menjadi butiran-butiran sekunder.
soil structure soil structure, a combination or arrangement of   primary soil granules into secondary granules.

soil survey penelitian rinci terhadap tanah pada areal tertentu termasuk pengeboran & pengujian untuk menentukan sifat, ketebalan, kekuatan, & kedalaman hingga batas lapisan batuan atas, terdiri atas pemetaan rinci, pembuatan uraian-uraian mengenai tanah & tata guna lahan.
soil survey detailed research on the ground in specific areas including drilling & testing to determine the nature, thickness, strength, & depth to the upper limit of the  rock layers, consisting of detailed mapping, creation of descriptions of the  land & land use.

source area areal (daerah sumber), yaitu daerah tempat asal bahan endapan (asal bahan sedimen).
source area area (source area), the area of   ​​ deposition materials place of  origin (the origin of   sedimentary material).

spacing jarak antara 2 (dua) lubang bor dalam 1 (satu) baris untuk peledakan lapisan tanah penutup.
spacing distance between 2 (two) drill holes within 1 (one) line for blasting overburden.

spar istilah di kalangan pertambangan untuk sisipan lapisan kecil lempung (urat lempung) dalam lapisan batubara.
spar term among mining to insert a small layer of  clay (clay veins) and the coal seam.

specific energy jumlah energi panas per satuan berat batubara yang biasanya dinyatakan dalam satuan joule atau kilo joule.
specific energy amount of   heat energy per unit weight of   coal  is usually expressed in units of   joules or kilo joules.

specific gravity of coal perbandingan antara berat batubara dalam volume tertentu dengan berat air yang volumenya sama dengan volume batubara tersebut.
specific gravity of coal ratio between  weight  of   coal  in the volume in particular with a water heavy with volume of   equal to the volume of the  coal.

speculative resource sumber-sumber batubara yang belum ditemukan yang mungkin terdapat dalam tanah di suatu daerah yang secara geologi memungkinkan adanya sumber tersebut.
speculative resource sources of undiscovered coal that may be present in the soil in an area that is geologically allow for that source.

split lapisan batubara yang dipisahkan dari lapisan batubara utama oleh lapisan batuan antara (parting) atau batuan sedimen lain.
split coal seams separated from the main coal seams by layers of   rock between (parting) or other sedimentary rocks.

split coal lapisan batubara yang terpisah (terbelah) oleh lapisan lempung, serpih atau batu pasir yang menebal sehingga tidak dapat ditambang bersama-sama pada 1 (satu) teras pertambangan.
split coal coal seams separated (split) by a layer of   clay, shale or sandstone that is thickened so it can not be mined together on 1 (one) terrace of mining.

split seam lapisan batubara yang membelah menjadi 2 (dua) atau lebih belahan (lapisan tipis) yang mungkin menyatu di suatu tempat yang relatif jauh.
split seam coal seam which divides into 2 (two) or more parts (thin layer) that may be fused in a relatively remote place.

splitting of sample pembagian conto yang berarti pengurangan jumlah conto meruah menjadi 4 (empat) bagian yang sama (quartering) atau lebih dari 4 (empat) bagian yang sama dengan kotak pembagi / rifflebox.
splitting of sample the  distribution of   samples, which means a reduction in the amount of   bulky samples into 4 (four) equal parts (quartering) or more than 4 (four) parts equal with a junction box / rifflebox.

spoil bahan buangan (kotoran), batuan atau bahan pengotor yang dibuang dari tempat asalnya seperti kupasan tanah penutup batubara atau batuan pengotor yang dibuang dari kegiatan penambangan terbuka.
spoil waste material (feces), rock or impurities are removed from the place of  origin such as peelings of overburden coal or rock impurities are removed from the open pit mining activities.

spoil bank tempat buangan atau tumpukan bahan buangan dari kegiatan penambangan terbuka.
spoil bank where effluent or waste material piles of  open pit mining activities.

spoil ground areal tempat pembuangan tanah atau batuan dari kegiatan penambangan atau penggalian tanah.
spoil ground area of  soil or rock dumps of   mining or excavation.

spoil heap tumpukan bahan buangan dari kegiatan penambangan batubara, penambangan bahan galian lainnya atau kegiatan penggalian lainnya.
spoil heap piles of   waste material from coal mining operations, mining other minerals or other excavation activities.

spoil material bahan buangan dari kegiatan tambang terbuka.
spoil material waste material from the open pit activities.

spoil pile areal penumpukan bahan buangan dari kegiatan penambangan.
spoil pile buildup area of   ​​waste material from mining activities.

spoil pit areal penumpukan bahan buangan dari kegiatan penambangan yang merupakan bekas tambang atau areal berbentuk cekungan.
spoil pit buildup area of waste material from mining activities that are ex-mining or basin-shaped area.

spoil segregation pemisahan kupasan atau penempatan tanah buangan di tempat terpisah (terisolasi) jauh dari lahan & batuan yang bermanfaat.
spoil segregation peeling separation or placement of   wasteland in a separate (isolated) away from land & rock helpful.

spontaneous combustion pembakaran spontan atau terbakar sendiri, yaitu proses kimia dan atau fisika yang terjadi umumnya pada batubara berderajat rendah, dimana batubara menjadi panas kemudian terbakar hanya karena berada pada udara terbuka dalam waktu yang relatif singkat, proses pembakaran spontan diawali dengan penyerapan oksigen dari udara, selanjutnya karena batubara mempunyai sifat kimia & fisika tertentu ditambah dengan adanya butiran-butiran batubara dengan ukuran-ukuran tertentu.
spontaneous combustion spontaneous combustion or burning themselves, namely chemical and or physical processes that occur generally in the low degree of coal, which burns coal to heat then only because they are in the open air in a relatively short time, the spontaneous combustion process begins with the absorption of   oxygen from  the air, furthermore because coal has certain physical & chemical properties coupled with the granules of coal with certain sizes.

spoon end ujung lapisan batubara yang berbentuk lancip seperti sendok yang terjadi pada proses pembentukan batubara cekungan, terjadi pada akhir pembentukan batubara ujungnya mengalami penekanan.
spoon end coal seam end in pointy shaped like a spoon that occur in the process of   formation of the coal basin, occurred at the end of the coal formation ends suppressed.

spoon sampler alat pengambil conto tanah berputar mempunyai ujung pemotong berbentuk spiral (auger).
spoon sampler maker tool of soil samples have rotating with spiral cutter tip (auger).

spot istilah untuk kapal dengan ukuran yang sesuai & segera dapat dicarter untuk waktu yang pendek & biasanya tersedia dekat dengan pencarter.
spot term for ships with the appropriate size & can immediately chartered for a short time & are usually available close to the charterer.

spraying penyiraman batubara siap jual di tempat penumpukan, di atas ban berjalan yang dihubungkan dengan dan menerima umpan tanah (batuan) kupasan dari sistem bucket wheel excavator pada tambang batubara terbuka.
spraying watering of   coal ready for sale in the buildup, above the conveyor belt that is connected with and receiving feedback of soil (rock) in critique of  the system of bucket wheel exavator in open coal mines.

spread of ash batas toleransi maksimum kandungan abu batubara kasar hasil penambangan (batubara rom) dengan kandungan batubara yang dikapalkan (dijual), batas toleransi sekitar 15% (15 % lebih tinggi dari kadar abu batubara rom).
spread of ash the tolerance of maximum limit of ash content of   coarse coal of mining production (coal rom) with coal deposits that are shipped (sold), the tolerance limit of   about 15% (15% higher than rom coal ash content).

stability kemantapan atau kestabilan, yaitu keadaan tetap di tempat, daya tahan lereng & tumpukan bahan buangan tambang terhadap longsor, ambruk atau membalik, kemantapan tanah atau batuan tergantung pada daya tahan geser bahan pembentuk tanah atau batuan, yang merupakan fungsi dari tahanan dalam & kohesi.
stability steadiness or stability, which is the state remains in place, the durability of the  slopes & piles of   mine waste material to landslides, collapsed or flipping, soil or rock stability depends on the durability of the sliding of forming material of the  soil or rock, which is a function of the  durability inside & cohesion.

stabilize memantapkan, menstabilkan, pekerjaan untuk membuat suatu material tetap di tempat (tidak berubah bentuk / tidak rusak), dicapai dengan cara mekanis atau dengan vegetasi (penghijauan) termasuk penanaman pohon, perdu, rumput & legum, atau dengan pemadatan mekanis.
stabilize strengthen, stabilize, work to create a material remains in place (do not deform / not damaged), accomplished by mechanical means or by vegetation (reforestation) including the planting of   trees, shrubs, grasses & legumes, or with mechanical compaction.

stacker sistem ban berjalan & strukturnya dapat bergerak untuk menumpahkan batubara ke tempat penumpukan.
stacker conveyor system & its structure can be moved to the coal shed to the buildup.

stacker-reclaimer sistem ban berjalan, struktur yang dapat bergerak & ujungnya terpasang teromol ember berputar (bucket wheel exavator) yang beroperasi baik sebagai pencurah batubara maupun sebagai pengambil batubara yang akan dicurahkan ke dalam tongkang atau kapal.
stacker-reclaimer conveyor system, a structure that can move & ends mounted rotating bucket drum (bucket wheel exavator) which operates both as dumpers of coal and coal-making that will be poured into a barge or ship.

stage loader alat pembawa batubara yang terdiri atas pelat-pelat yang digerakkan oleh rantai, dipasang sebagai satu kesatuan dengan mesin pemotong batubara pada sistem tambang batubara lubang buka.
stage loader carrier of coal consisting of   plates driven by a chain, mounted as one unit with the coal cutting machine in open pit coal mine system.

staging pentahapan, pengaturan kegiatan utama pertambangan, misalnya pembersihan jalan, pembuangan tumbuhan, & pengumpulan tanah pucuk, sehingga pada setiap saat berbagai tahap kegiatan pembersihan lahan, ekstraksi batubara & reklamasi dapat dilaksanakan serempak.
staging phasing, setting the main activity of   mining, such as street cleaning, removal of   vegetation, & the collection of   top soil, so that at any time the different stages of   land clearing activities, the extraction of   coal & reclamation can be carried out simultaneously.

standard baku atau ukuran dasar, misalnya untuk tambang batubara terbuka, kualitas baku air ditetapkan sesuai nilai ambang batas bahan pencemarnya atau tidak mengandung zat-zat beracun lebih dari kadar maksimum tertentu sebelum dialirkan ke perairan umum.
standard raw or basic size, for example, to open coal mines, the water raw quality ​​set in accordance limit values of pollution materials or does not contain toxic substances more than the maximum levels specified before being drained into public waters.

stemmer tongkat kayu bulat untuk mendorong & memadatkan penyumbat (stemming) lubang tembak, dapat digunakan untuk memeriksa kedalaman & ukuran (diameter) lubang peledakan serta mendorong bahan peledak.
stemmer round wooden stick to push & compact the plug (stemming) of bullet holes, can be used to check the depth & size (diameter) of blasting hole and encourage explosives.

stemming bahan penyumbat lubang bor untuk membantu menghasilkan peledakan yang baik, biasanya terbuat dari lempung, remukan batuan/tanah hasil pemboran, atau cairan kimia yang cepat membeku.
stemming stopper material of drill holes to help produce a good blasting, usually made of clay, crushed of rock / soil of drilling results, or chemical liquids in quickly freeze.

steril endapan bahan galian atau cadangan bahan galian termasuk batubara yang tidak dapat ditambang karena permukaan tanah di atasnya telah terganggu atau menjadi tempat timbunan tanah buangan atau limbah pertambangan.
sterile precipitate of minerals or minerals reserves including coal that can not be mined because the surface of the  ground above has been disrupted or become a pile of   waste land or waste mines.

stockpile tempat penumpukan atau bahan yang ditumpuk untuk diambil, diolah, dipasarkan, atau dimanfaatkan kemudian.
stockpile a buildup or materials are stacked to be taken, processed, marketed, or used later.

stockpiling pembentukan tempat penyimpanan terhadap bahan berharga, tanah atau batuan untuk dimanfaatkan, penimbunan tanah secara khusus ditujukan untuk pembentukan permukaan tanah & menyediakan tanah untuk pertumbuhan tanaman pasca tambang terbuka.
stockpiling storage formation of  the  valuable materials, soil or rocks to be used, landfill is specifically aimed at the formation of   ground level & provide soil for plant growth after the open pit mine.

stoping pekerjaan peremukan atau pengambilan bijih atau bahan galian logam di dalam tambang.
stoping work crushing or extraction of   ores or metal minerals in the mine.

stopping dinding pemisah pada lubang ventilasi tambang dalam yang dibuat untuk memisahkan aliran udara segar & aliran udara kotor dari permukaan tambang.
stopping the separation wall in the mine ventilation holes are made to separate the flow of   fresh air & dirty air flow from surface mines.

storing (istilah lama dari Bahasa Belanda) sesar (patahan).
storing (long term from the Dutch) fault.

stowage pekerjaan pengisian ruangan yang terjadi akibat ekstraksi batubara pada sistem lubang buka tambang dalam, berasal dari tanah atau batuan di permukaan yang tidak jauh dari lubang masuk bahan isian, & sebelum dimasukkan bahan terlebih dahulu dicampur air untuk memudahkan pemasukan atau pemompaan, untuk mencegah penurunan permukaan tanah.

stowage space filling jobs that occur due to the extraction of   coal in open pit in the underground mines system, derived from soil or rock on the surface which is not far from the inlet of the  packing material, & before it is put first material mixed with water to facilitate the entry or pumping, to prevent subsidence of ground.

strata lapisan-lapisan batuan endapan khususnya batu lanau atau serpih, yang terletak di atas atau di antara lapisan-lapisan batubara, formasi batuan yang terdiri atas batuan-batuan yang sama atau hampir sama seluruhnya.
strata layers of   sedimentary rocks, especially silt rock or shale, which lies on top of   or in between layers of   coal, rock formations consisting of   rocks of the  same or nearly the same entirely.

stratified bentuk lapisan yang tersusun atas aluvium yang merupakan bahan-bahan berlapis-lapis, lapisan-lapisan tanah yang terbentuk karena proses geologi disebut horizon, sedangkan lapisan-lapisan tanah yang terbentuk dari batuan asal dinamakan strata.
stratified form layers composed of   alluvium which are ingredients in layers, the layers of   soil that is formed due to geological processes called horizon, whereas the soil layers formed of   origin rock is called the strata.

stratigraphic exploration pekerjaan eksplorasi termasuk pemboran untuk mengetahui susunan geologi & jenis formasi batuan pada suatu wilayah penyelidikan.
stratigraphic exploration exploration work including drilling to determine the geological composition & type of   rock formation in an investigation region.

stratigraphy stratigrafi, ilmu tentang lapisan batuan atau susunan batuan-batuan, cabang dari geologi yang berhubungan dengan definisi & uraian batuan sedimen khususnya berkaitan dengan singkapan batuan atau batuan di bawah permukaan.
stratigraphy stratigraphy, the study of   rock layers or arrangement of   rocks, branches of   geology relating to the definition & description of   sedimentary rocks with particular regard to outcrop or rock below the surface.

stratum suatu letakan (lapisan massif) batuan yang memisahkan 2 (dua) lapisan batuan yang komposisinya berbeda atau memiliki ciri berlainan, strata (jamak).
stratum of   a placer (massive layer) of rock that separates 2 (two) of rock layers with compositionally different or have different characteristics, strata (plural).

strike sama dengan jurus (lihat jurus).
strike at the moment (see stance).

strikeline garis struktur kontur yang lurus, sejajar, & berjarak vertikal sama.
strikeline contour structure line in straight, parallel to, & within the same vertical.

strike of   meratakan bagian atas gundukan tanah buangan dengan alat mekanis untuk membentuk tumpukan terpotong.
strike of   leveling the top of the  exhaust mound with a mechanical device to form a stack truncated.

strip mengupas atau memindahkan tanah, batuan, & bahan lainnya untuk membuka lapisan batubara yang umumnya terdapat relatif dangkal, pekerjaan pengupasan atau pembuangan tanah (batuan) penutup bahan galian lainnya yang relatif tipis, biasanya kurang dari 30 meter - 40 meter.
strip peeling or moving soil, rocks, & other materials to open coal seams generally are relatively shallow, stripping jobs or disposal of   cover soil (rock) of other minerals that are relatively thin, typically less than 30 metres - 40 metres.

strip bench teras kupasan, teras atau lantai permuka tambang terbuka yang aktif maupun yang telah ditinggalkan, termasuk teras yang sengaja dibuat untuk reklamasi pasca tambang terbuka.
strip bench peeling porch, patio or floor open pit surface in active or have been abandoned, including the terraces are made available for reclamation post-open mining.

strip mine tambang kupas atau tambang terbuka, tambang permukaan yang merupakan kegiatan pengupasan atau pemindahan tanah (batuan) untuk membuka bahan galian layak tambang, tambang terbuka, dimana pengupasan tanah dilakukan dalam bentuk rangkaian baris-baris pengupasan & baris-baris tumpukan memanjang kupasan (buangan) tanah.
strip mine strip mining or open-pit mining, surface mining is an activity of stripping or removal of   soil (rock) to open the excavated materials in worth mining, open pit mines, where stripping is done in the form of   stripping in a series of   rows of   the pile extends criticism (discharge ) of ground.

strip mining pertambangan kupas atau pertambangan baris yang secara khusus merupakan sistem tambang terbuka atau tambang permukaan untuk batubara, terbagi atas tambang area & tambang kontur, operasi pengupasan tanah atau batuan penutup lapisan batubara dengan bentuk pengupasan baris-baris sejajar.
strip mining strip mining or line mining that specifically is a system of   open pit or surface mining for coal, consisting of  mining areas &  mining contours, operation of stripping   overburden or stripping coal seam with a form of parallel lines.

stripping pekerjaan pengupasan & pemindahan lapisan penutup endapan bahan galian layak tambang pada metode tambang terbuka.
stripping work of   stripping & overburden removal of sediment of excavated  materials in worth mining at the open pit methods.

stripping area areal pengupasan tambang terbuka yang mencakup bahan galian layak tambang, kedalaman, ketebalan lapisan tanah atau batuan yang akan dibuang, bentuk permukaan tanah/batuan penutup endapan bahan galian, & kemantapan lereng penggalian (teras-teras tambang terbuka).
stripping area ​​the open pit stripping area that includes minerals in worth mining, the depth, the thickness of the  layer of   soil or rock that will be removed, forms the surface of soil / sediment of rock overburden of excavated material, & the stability of the  slope of excavation (terraces of open pit).

stripping-pit limits batas-batas bukaan tambang yang meliputi luasan bahan galian layak tambang ditambah bukaan untuk memperoleh faktor keamanan teras-teras tambang, volume tanah kupasan secara keseluruhan adalah volume tanah tegak lurus di atas alas bukaan ditambah dengan volume yang timbul akibat pembuatan teras-teras tambang dengan geometri yang aman & volume penggalian permukaan untuk mendekati mulut galian tambang terbuka.
stripping-pit limits the boundaries of the  mine openings covering an area in worth minerals mining plus openings for obtaining safety factor of terraces of mines, overall land peeling volume is the volume of   upright land on a pedestal of openings coupled with volume arising from the manufacture terrace of mines with a safe geometry & surface excavation volume to approach  the mouth of  the  open pit excavation.

stripping ratio sama dengan nisbah kupasan (lihat nisbah kupasan).
stripping ratio is equal to the ratio of peel (see peeling ratio).

stripping machine alat-alat berat yang digunakan untuk kegiatan pengupasan lapisan tanah atau batuan penutup lapisan batubara &  bahan galian lainnya (termasuk mesin bor untuk membuat lubang-lubang ledak).
stripping machine heavy equipment used for soil removal activities or overburden layers of   coal & other minerals (including drilling machine to make explosive holes).

stripping shovel alat berat singkup mesin termasuk alat-alat hidrolik yang mempunyai batang gali panjang (boom & stick) untuk memperoleh jangkauan penggalian lebih panjang & penumpukan material lebih tinggi.
stripping shovel shovel heavy equipment machinery including hydraulic tools that have long dug rod (boom & stick) to acquire range longer-excavation & higher material buildup.
 

Tidak ada komentar:

Posting Komentar

UNTUK KE-GUBERNUR-AN SUMATERA UTARA, TEKNIK PERTAMBANGAN UM (UNIVERSITAS MANDAILING), KUM S3 MET 09 SEPTEMBER 2445 M (KULIAH UMUM SABTU SORE SEPANJANG MASA ELECTRONIC TELECONFERENCE 09 SEPTEMBER 2445 MASEHI)

  https://www.youtube.com/@agussalimnasutionmandailing2/videos EVOLUSI PENDIDIKAN LOKAL MANDAILING  UNTUK RENTANGAN TAHUN 2445 - 2024  =  42...